Closing soon

Athletic Field Stormwater Conveyance Reconfiguration Project – Phase 2

Description: The new stormwater system project reconfigures stormwater runoff conveyance near the athletic fields at High School. The project includes installing a new stormwater manhole, associated stormwater conveyance piping, cutting and grouting existing stormwater conveyance piping, trench excavation and trench preparation for new stormwater conveyance piping, a rip rap apron, construction erosion and sediment control, grading, and site restoration through landscaping and seeding.

Buyer
Mount Pleasant Area School District

SchoolDistrict · PA, US

Released
-
Closes
Oct 1, 2026(14 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts