Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Mattoon Community Unit School District 2
The project consists of updates and renovations to the existing cafeteria/commons and serving area at Mattoon Middle School. The scope will be limited to the spaces outside of the dish room and kitchen area.
Posted Date
Feb 20, 2026
Due Date
Mar 3, 2026
Release: Feb 20, 2026
Mattoon Community Unit School District 2
Close: Mar 3, 2026
The project consists of updates and renovations to the existing cafeteria/commons and serving area at Mattoon Middle School. The scope will be limited to the spaces outside of the dish room and kitchen area.
AvailableMattoon Community Unit School District 2
The project consists of removing two 70-ton condensing units and their associated remote evaporator and replacing them with a single 140-ton air cooled chiller, and removing and replacing the existing base mounted chilled water pumps. Work includes modifying the existing chilied water piping, and the electrical and control feeds to the chiller, and pumps. The existing VFDs shall be removed and replaced.
Posted Date
Sep 19, 2025
Due Date
Oct 8, 2025
Release: Sep 19, 2025
Mattoon Community Unit School District 2
Close: Oct 8, 2025
The project consists of removing two 70-ton condensing units and their associated remote evaporator and replacing them with a single 140-ton air cooled chiller, and removing and replacing the existing base mounted chilled water pumps. Work includes modifying the existing chilied water piping, and the electrical and control feeds to the chiller, and pumps. The existing VFDs shall be removed and replaced.
Mattoon Community Unit School District 2
The project consists of: Base Bid: Consists of removing and replacing the four existing 2,000,000 btu/hr hot water boilers, and their associated two base mounted hot water pumps, and replacing them with four new 2,000,000 btu/hr hot water boilers and two new base mounted pumps. Work includes modifying the existing heating hot water piping, gas piping, flue piping and the electrical and control feeds to the boilers. The existing VFD shall be removed and replaced with two VFD's. The existing system shall remain in operation during work, only one pump shall be replaced and made operational before work starts on the second, and only two boilers shall be replaced and made operational before the remaining two are replaced. Alternate Bid #1: Consists of removing and replacing the existing 1,200,000 btu/hr domestic hot water heater and its associated recirculation pump, and replacing it with three 199,000 btu/hr water heaters and new recirculation pump. Work includes modifying the existing domestic water piping, gas piping, flue piping, and the electrical feed to the hot water heaters.
Posted Date
Jul 18, 2025
Due Date
Aug 6, 2025
Release: Jul 18, 2025
Mattoon Community Unit School District 2
Close: Aug 6, 2025
The project consists of: Base Bid: Consists of removing and replacing the four existing 2,000,000 btu/hr hot water boilers, and their associated two base mounted hot water pumps, and replacing them with four new 2,000,000 btu/hr hot water boilers and two new base mounted pumps. Work includes modifying the existing heating hot water piping, gas piping, flue piping and the electrical and control feeds to the boilers. The existing VFD shall be removed and replaced with two VFD's. The existing system shall remain in operation during work, only one pump shall be replaced and made operational before work starts on the second, and only two boilers shall be replaced and made operational before the remaining two are replaced. Alternate Bid #1: Consists of removing and replacing the existing 1,200,000 btu/hr domestic hot water heater and its associated recirculation pump, and replacing it with three 199,000 btu/hr water heaters and new recirculation pump. Work includes modifying the existing domestic water piping, gas piping, flue piping, and the electrical feed to the hot water heaters.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $35,000, use sole source.
Coops: If your solution is on a recognized coop, propose using it to expedite.
Mattoon Community Unit School District 2, IL shows no evidence of sole source awards above $35,000.
Board meetings and strategic plans from Mattoon Community Unit School District 2
The Matthew School Board resumed open session following an executive session. The key action taken was the motion to adjourn the meeting, which was subsequently approved by roll call vote.
This document presents the revised Vision Statement for Mattoon Community Unit #2, adopted in 2005, which aims to prepare students for a technologically oriented 21st Century environment. The plan focuses on developing students' problem-solving, communication, and information interpretation skills. Key support strategies include comprehensive staff development for teachers and paraprofessionals, strategic technology and software procurement for flexible learning, community involvement in technology initiatives, integration of technology standards into the curriculum, and training for administrators to support classroom technology. The overarching goal is to enable the community to excel in a technology and information-driven society.
This action plan for Mattoon Community Unit #2 outlines strategies and goals across four key areas: community involvement, curriculum and instruction, professional development, and technology deployment and sustainability. The plan aims to assist students and community members in effectively using technology through collaboration, increase the use of technology in instructional practices by administrators, teachers, and students, strengthen staff understanding and application of technology standards and data analysis, and sustain current technology resources to support these initiatives.
This multi-phase plan outlines strategies for integrating technology into the educational environment across three phases, spanning from 2005 to 2008. Key focus areas include enhancing community involvement through technology, integrating technology into curriculum and instruction to improve student learning, providing professional development for staff on effective technology use, and ensuring the deployment and sustainability of technology infrastructure. The plan aims to foster a student-centered learning environment and improve educational outcomes through strategic technology implementation.
This document outlines a three-year technology plan for Mattoon Schools, focusing on enhancing educational outcomes and operational efficiency through technology. Key strategic pillars include fostering community involvement, integrating technology into curriculum and instruction to improve math scores, providing robust professional development for staff, and ensuring effective technology deployment and support. The plan aims to achieve higher parent participation, improved student achievement, enhanced staff capabilities, and a reliable technological environment.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Mattoon Community Unit School District 2's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Mattoon Community Unit School District 2's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database