B2-27 CABRILLO HS PILOT STOREFRONT REPLACEMENT
Aug 7, 2026
Closes
Sep 7, 2026
This active construction bid covers demolition and abatement of one section of existing storefront at Cabrillo High School, installation of a new storefront system, and all associated labor and materials. Lompoc Unified School District identifies it as a pilot project to determine cost and best practices before performing the same scope on the remaining storefront systems at the school. The PlanetBids record is in the Bidding stage, was posted on 08/07/2026 at 4:04 PM (PDT), and closes on 09/07/2026 at 2:00 PM (PDT).
