Water Treatment Department Proposed Garage RFP
Posted
Oct 28, 2026
Dec 1, 2026
This project generally includes the following work tasks: 1. Clear site including tree removal and grading. 2. Obtain required building permits (no local fee). 3. Construction of reinforced building footings, grade beam, and building anchor bolts. 4. Construction of concrete slab with stone base. 5. Procurement and construction of a 60’ x 60’ x 20’ (H) pre-fabricated, insulated steel structure. 6. Install electrical and heating systems, and relocate light pole. 7. Install 6" PVC roof drains and connect to building gutters with overflow "T"s. 8. Construct concrete curb, D.G.A. base course and H.M.A. surface courses for building driveways. Recycled D.G.A. is not permitted on this project. 9. Install chain-link fence with electric rolling gate and post & rail wood fencing. 10. Topsoil, seed, and straw mulch all disturbed areas. 11. Clean up the work zones to the satisfaction of the Engineer and the Municipal Water Department.



