Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lake Oswego School District 7J
2025 Bond Program's Forest Hills Elementary School Replacement Project: Complete replacement of the existing school building with a new 69,500 SF, two-story school, on and off-site improvements, outdoor covered play area, and outdoor play and education areas.
Posted Date
Mar 16, 2026
Due Date
Apr 7, 2026
Release: Mar 16, 2026
Lake Oswego School District 7J
Close: Apr 7, 2026
2025 Bond Program's Forest Hills Elementary School Replacement Project: Complete replacement of the existing school building with a new 69,500 SF, two-story school, on and off-site improvements, outdoor covered play area, and outdoor play and education areas.
AvailableLake Oswego School District 7J
Elementary school reclad and fire alarm replacement. The existing elementary school is a one-story building with attached covered play area. The proposed project includes the removal of the brick cladding material, sheathing and batt insulation back to the wood studs and associated site demo. Installation of brick cladding material, rigid insulation, plywood sheathing, batt insulation, vapor barrier and associated site repairs. Removal and reinstallation of the existing storefront systems. Removal and replacement of dry rot beams at covered play area with associated siding removal and reinstallation. Fire alarm replacement with removal of pull stations and horn strobes and installation of speaker strobes. Construction scope: construction, demolition, and renovation.
Posted Date
Feb 19, 2026
Due Date
Mar 19, 2026
Release: Feb 19, 2026
Lake Oswego School District 7J
Close: Mar 19, 2026
Elementary school reclad and fire alarm replacement. The existing elementary school is a one-story building with attached covered play area. The proposed project includes the removal of the brick cladding material, sheathing and batt insulation back to the wood studs and associated site demo. Installation of brick cladding material, rigid insulation, plywood sheathing, batt insulation, vapor barrier and associated site repairs. Removal and reinstallation of the existing storefront systems. Removal and replacement of dry rot beams at covered play area with associated siding removal and reinstallation. Fire alarm replacement with removal of pull stations and horn strobes and installation of speaker strobes. Construction scope: construction, demolition, and renovation.
Lake Oswego School District 7J
High school flooring replacement.
Posted Date
Feb 17, 2026
Due Date
Mar 18, 2026
Release: Feb 17, 2026
Lake Oswego School District 7J
Close: Mar 18, 2026
High school flooring replacement.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $250,000, use sole source.
Coops: Start with a cooperative (Sourcewell or OMNIA). Confirm your product is on-contract and proceed via piggyback with the sponsoring department.
Lake Oswego School District 7J, OR allows sole source under Policy DJC when written findings show goods/services are unique. The district has limited sole source history and generally prefers competitive/cooperative paths, making sole source inefficient here.
Board meetings and strategic plans from Lake Oswego School District 7J
This document serves as the Lake Oswego School District's calendar for the 2026-2027 school year. It outlines important dates such as holidays, breaks, teacher professional development days, and early dismissals, providing a structured schedule for academic and operational activities. The calendar includes specific dates for school starts, school resumes, various grade preparation days, and conferences.
The agenda included approval of minutes from previous meetings, a construction change order for the Lake Oswego Middle School project, and a presentation on the Culture of Belonging by student presenters. There were also comments from patrons regarding Ziply Fiber's work permit and questions about the cell tower on Lakeridge High School property. The Superintendent provided updates on student artwork, the LO Schools Foundation's phone-a-thon, the Lake Oswego Fire Department's provision of "stop the bleed kits," the federal shutdown's potential effects on the school lunch program, immigration enforcement, Unity Day, outdoor school, and the upcoming election day. Additionally, there was a Native American Heritage Month Resolution, a Citizen Bond Campaign update, an overview of OSAS state assessment data, a Division 22 Standards Assurance Report, a preliminary unaudited financial report, a cell tower update, an amendment to the LORAC intergovernmental agreement with the City, and an appeal of an administrative decision.
The 2024-25 Integrated Programs Annual Report for LOSD 7J focuses on increasing the regular attenders rate for all students and improving graduation rates for students with disabilities and economically disadvantaged students. Key strategies include implementing Student Success Teams, integrating SEL, reducing class sizes, and providing targeted interventions. The plan also addresses challenges such as chronic absenteeism through consistent attendance outreach, expanded wellness staffing, and family engagement. Future plans involve strengthening attendance monitoring systems, deepening SEL integration, and leveraging high-dosage literacy tutoring.
The Lake Oswego School District's integrated programs application focuses on equity, well-rounded education, engaged community, and strengthened systems. Key areas of focus include implementing an equity lens in planning and budgeting, building staff capacity through professional development, ensuring inclusion of children and youth navigating houselessness, and providing opportunities for all students to participate in CTE programs. The plan also emphasizes curriculum design aligned with state and national standards, creating a safe and welcoming educational environment, and supporting students and families through various transitions.
The committee reviewed the 2013-14 Board priorities and strategic planning, focusing on the successful Local Option Levy renewal and new collective bargaining agreements. The March 2014 financial model was presented, highlighting the district's progress toward a sustainable program level. Key discussion points included the 2014-15 budget, addressing state revenues, local option revenues, and contingency planning for PERS, health benefits, and staffing. The committee also reviewed school allocations for 2014-15, preliminary capital projects, and Scenario B fiscal year 2012-13 savings. A new chair for the Legal Budget Committee was elected.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lake Oswego School District 7J's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database