Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Jordan Basin Improvement District
Installation of additional wastewater equipment, including a coarse screen, fine screen, centrifuge and appurtenant equipment and upgrades to the existing wastewater reclamation facility.
Posted Date
Jan 26, 2026
Due Date
Mar 2, 2026
Release: Jan 26, 2026
Jordan Basin Improvement District
Close: Mar 2, 2026
Installation of additional wastewater equipment, including a coarse screen, fine screen, centrifuge and appurtenant equipment and upgrades to the existing wastewater reclamation facility.
Jordan Basin Improvement District
Provide ge vernova electrification software.
Posted Date
Oct 21, 2025
Due Date
Oct 28, 2025
Release: Oct 21, 2025
Jordan Basin Improvement District
Close: Oct 28, 2025
Provide ge vernova electrification software.
Jordan Basin Improvement District
Work consists of installation of approx 4,800 LF of 21" pvc sewer pipe, 28 corrosion resistant manholes, 23 sewer lateral reconnections, removal of existing sewer manholes and pipe, trenchless installation of 546 LF of 36" steel casing (two crossings), construction of a temporary access road, surface restoration, dewatering, and bypass pumping. See outside link & attached files.
Posted Date
Sep 5, 2025
Due Date
Oct 13, 2025
Release: Sep 5, 2025
Jordan Basin Improvement District
Close: Oct 13, 2025
Work consists of installation of approx 4,800 LF of 21" pvc sewer pipe, 28 corrosion resistant manholes, 23 sewer lateral reconnections, removal of existing sewer manholes and pipe, trenchless installation of 546 LF of 36" steel casing (two crossings), construction of a temporary access road, surface restoration, dewatering, and bypass pumping. See outside link & attached files.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Jordan Basin Improvement District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database