Village Grande Pump Station Force Main Lining
Posted
Sep 4, 2026
Sep 17, 2026
Pump station force main lining. Project includes the location and lining of an existing 6” force main with a flexible fiber reinforced liner. Specific work will include completion of test pits to locate the existing force main alignment; installation of a temporary bypass system; excavation of access pits; force main lining; force main pipe replacement where necessary; replacement of air release valves, piping and fittings; rehabilitation of the existing discharge manhole; pavement and driveway restoration as noted; and other miscellaneous site improvements; as well as all other Work.