The City of Fairhope is requesting responses from qualified contractors to provide all material, equipment, labor, and incidentals for the project generally described as follows: The installation of upgrades to the existing Grand Hotel Lift Station and construction of the new Scenic 98 Lift Station. Sewer collection/conveyance system upgrades include the installation of two (2) manholes and approximately 80 L.F. of 10" and 12" PVC gravity sewer main, as well as the installation of approximately 520 L.F. of 12" HDPE force main, 80 L.F. of 10" and 12" Ductile Iron force main, 480 L.F. of 4" PVC force main, 180 L.F. of 8" PVC force main, 1,460 L.F. of 10" PVC force main, two (2) 12" plug valves, two (2) 10" plug valves, two (2) Combination Air Relief Valves, six (6) connections to existing force mains, and associated appurtenances.
The City of Fairhope is accepting proposals from qualified firms to provide engineering and other professional services related to Civil Engineering/Surveying for Transportation and Pedestrian Improvements within the Twin Beech Road (County Road 44) corridor between US Highway 98 and County Road 13.
Publication Date/Time: 10/29/2026 5:00 AM
Closing Date/Time: 11/5/2026 2:00 PM
Submittal Information: Sealed Bids must be received at City of Fairhope, 555 S. Section St. Fairhope, AL
Addendum Date/Time: 10/15/2026
Contact Person: Procurement and Contracts Manager: Erin Wolfe Email: [email protected]
Download Available: Yes
Plan & Spec Available: See attached
Business Hours: 8:00 a.m. to 4:00 p.m.
Special Requirements: Proposer must submit one (1) original paper copy of proposal, five (5) identical paper copies of proposal, and one (1) electronic identical copy of proposal on a thumb drive.
Related Documents: RFQ PS27-005 Prof Engineer - Twin Beech Corridor Improvement; RFQ PS27-005 Addendum 1; RFQ PS27-005 Addendum 2
Bids will be publicly opened and read aloud. A summary of the work items is included below: The Work included in this Contract generally consists of partially draining and cleaning an existing Orbal Aeration Basin, the installation of Owner-provided equipment consisting of 1080, 9" disc diffusers and associated in-basin piping, and one positive displacement blower with variable frequency drive. In addition to the installation of the pre-purchased equipment, the contractor will furnish and install all yard piping, all necessary electrical appurtenances to provide power and control to the blower, metal canopy and foundation, asphalt patching, and site restoration. The installation is located at the Fairhope Wastewater Treatment Plant.
Publication Date/Time: 10/29/2026 5:00 AM
Closing Date/Time: 11/17/2026 2:00 PM
Submittal Information: Sealed Bids must be received at City of Fairhope, 555 S. Section St. Fairhope, AL
Pre-bid Meeting: 11/03/2026 (Non-mandatory)
Contact Person: Procurement and Contracts Manager: Erin Wolfe; Engineer: Krebs Engineering
Plan & Spec Available: Complete sets of electronic Bidding Documents are available for download through Quest Construction Data Network. The bidding documents are available using Reference Quest Number 10394618. To be considered a plan holder, Bidders will be required to register with QuestCDN.com for a free regular membership and download the bidding documents for a $22 fee. Hard copies of the Bidding Documents are the responsibility of the Bidders. Contact QuestCDN at (952)-233-1632 for assistance.
Business Hours: 8:00 a.m. to 4:00 p.m.
Related Documents: Bid No. 27-001-2026-SEW-003 Advertisement; Bid 27-001-2026-SEW-003 Addendum 1; Bid 27-001-2026-SEW-003 Addendum 2
Board meetings and strategic plans from H L Sonny Callahan Airport
Fairhope Airport Authority Regular Meeting
Date: Aug 11, 2026Type: Meeting mention
The board approved a gate and fence project, a hangar enclosure request from Continental, and preliminary plans for P-18 hangars. Reports were provided regarding traffic, engineering projects including the AWOS installation, and financial status. Discussions included the potential for T-hangar development, upcoming conference attendance, taxiway rehabilitation funding strategies, and the appointment of a nominating committee for next year's officers. The board also extended the cure period for a lease transfer to facilitate investor re-assignment.
Fairhope Airport Authority Regular Meeting
Date: Nov 18, 2025Type: Meeting mention
The meeting featured an update on the ongoing Runway Project, including the closure status of specific runways, lighting work progress, and temporary marking schedules. The Airport Manager reported on traffic counts and successful coordination with ALDOT. Operational updates included the management of an inoperable aircraft, lease payment status, and fuel sales data from Flightline First. Additionally, the Engineer provided details on the Seal Coat Project schedule, site development for the West Side, and handled materials at the southwest end of the airport. The Treasurer presented an updated Profit and Loss statement, and operational hours were adjusted for the FBO.
Native sync to Salesforce & HubSpot
Fairhope Airport Authority Special Call Meeting
Date: Aug 18, 2026Type: Meeting mention
The board meeting focused on the consideration and approval of a grant application for land reimbursement through the Airport Improvement Program (AIP).
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track H L Sonny Callahan Airport meetings, strategic plans, and budget discussions before the public bid appears.