Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Germantown Purchasing Division
Furnishing and delivery of ready-mix concrete to various sites within the City of Germantown on an as-needed basis. Items include - 4,000 psi mix, standard aggregate; 4,000 psi mix, limestone aggregate; 3,500 psi mix, pea gravel aggregate; flowable fill; one percent calcium chloride accelerator; two percent calcium chloride accelerator; see attached file.
Posted Date
Jun 8, 2026
Due Date
Jun 25, 2026
Release: Jun 8, 2026
Germantown Purchasing Division
Close: Jun 25, 2026
Furnishing and delivery of ready-mix concrete to various sites within the City of Germantown on an as-needed basis. Items include - 4,000 psi mix, standard aggregate; 4,000 psi mix, limestone aggregate; 3,500 psi mix, pea gravel aggregate; flowable fill; one percent calcium chloride accelerator; two percent calcium chloride accelerator; see attached file.
AvailableGermantown Purchasing Division
Project consists of road widening. Scope includes road and drainage excavation, the installation of concrete pipe culverts and manholes, and the application of new asphalt pavement sections. Additionally, the work encompasses comprehensive erosion control measures, tree protection, and traffic control phasing to maintain safety during construction. See attached file
Posted Date
Apr 27, 2026
Due Date
May 19, 2026
Release: Apr 27, 2026
Germantown Purchasing Division
Close: May 19, 2026
Project consists of road widening. Scope includes road and drainage excavation, the installation of concrete pipe culverts and manholes, and the application of new asphalt pavement sections. Additionally, the work encompasses comprehensive erosion control measures, tree protection, and traffic control phasing to maintain safety during construction. See attached file
Germantown Purchasing Division
Work includes 22 SY removal of asphalt pavement, all depths; 23 SY removal of driveways; 6 SY removal of concrete sidewalk; 202 SY removal of curb & gutter; 120 SY solid sodding; 204 LF temporary silt fence; 1 EA inlet siltation guard; 25 LF wattles, 20"; 17 ton granular material, size 57; 80 ton size 610 crushed stone base22 SY soil-cement-water mixing, optional mixers, base; 3 ton 9. 5-mm, mt, asphalt pavement; 291 LF saw cut, full depth; 179 LF 15" reinforced concrete pipe, class iii. See attached file.
Posted Date
Apr 10, 2026
Due Date
May 7, 2026
Release: Apr 10, 2026
Germantown Purchasing Division
Close: May 7, 2026
Work includes 22 SY removal of asphalt pavement, all depths; 23 SY removal of driveways; 6 SY removal of concrete sidewalk; 202 SY removal of curb & gutter; 120 SY solid sodding; 204 LF temporary silt fence; 1 EA inlet siltation guard; 25 LF wattles, 20"; 17 ton granular material, size 57; 80 ton size 610 crushed stone base22 SY soil-cement-water mixing, optional mixers, base; 3 ton 9. 5-mm, mt, asphalt pavement; 291 LF saw cut, full depth; 179 LF 15" reinforced concrete pipe, class iii. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge