Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Shelby County
Provide design and easement acquisition consulting services for the proposed sanitary sewer lift station generator installation; easement survey layout, and negotiated acquisition; coordination with memphis light, gas, and water (mlgw) as required; determine appropriately sized generator for power requirements and location; establishment of criteria and requirements for the automatic transfer switch and power supply interruption communication links to notify the generator of circuit failures and supply power to the affected lift station; provide 100% design, specifications and bid sheet and support city staff through the pre-bid, bid, bid evaluations, and board of mayor and aldermen (bma) approval; provide construction contract administration (c/a) during construction and on-site inspection after construction bid award.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Baudette
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
City of Baudette
Close: Dec 4, 2025
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
AvailableUniversity Of Arkansas
Work includes replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
Posted Date
Nov 9, 2025
Due Date
Dec 9, 2025
Release: Nov 9, 2025
University Of Arkansas
Close: Dec 9, 2025
Work includes replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
AvailableCity of Brighton
Perform owner's advisor services for the lift station and force main progressive.
Posted Date
Oct 22, 2025
Due Date
Dec 6, 2025
Release: Oct 22, 2025
City of Brighton
Close: Dec 6, 2025
Perform owner's advisor services for the lift station and force main progressive.
AvailableUnion County
Provide qualified firms to provide professional sanitary sewer evaluation services and engineering services.
Posted Date
Feb 24, 2025
Due Date
Nov 25, 2025
Release: Feb 24, 2025
Union County
Close: Nov 25, 2025
Provide qualified firms to provide professional sanitary sewer evaluation services and engineering services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis