Business 331 Sidewalk Extension RFP
Jul 29, 2026
Closes
Sep 1, 2026
Work includes construction of 2,900-LF of concrete sidewalk, drainage improvements including drainage structures, culverts and drainage piping, asphalt and concrete driveway replacements, thermoplastic stripping, and construction of 400-LF of raised timber boardwalk.
