Annual Stormwater General Construction
Posted
Aug 25, 2026
Oct 7, 2026
Work includes approx 100 LF of concrete curb & gutter type E; 750 LF of concrete curb & gutter type F; 100 LF of concrete curb type D; 500 LF of concrete valley gutter; 500 LF of head curb; 750 SY of 4" concrete sidewalk; 750 SY of 6" concrete sidewalk/driveway; 999 LF of 6" thermoplastic pavement markings standard white, yellow or blue (Solid); 1000 LF of 6" thermoplastic pavement markings standard, white, yellow, or blue (Skip-Line); 100 LF of 12" thermoplastic pavement markings white solid; 99 LF of 24" thermoplastic pavement markings standard, white solid; 180 LF of 4-6" pressure pipe offset; 180 LF of 8-10" pressure pipe offset; 180 LF of 12" pressure pipe offset.
