Construction of Adams Avenue Rule 20b Underground Utility District No. 22
Posted
Sep 10, 2026
Oct 13, 2026
Work inlcudes mobilization; utility investigation, potholing, and field verification; permitting; inspection scheduling through tessa; traffic control; erosion control; demolition; trenching; furnishing and installing conduits with poly-pull ropes including service laterals to each house; installation of vaults, manholes, utility pull boxes, handholes, warning tape, sub-meter panels, customer-owned service conduits; pavement resurfacing and restoration; landscape restoration; reconstruction of right-of-way; private back/side yard restoration, protection of existing property walls and footings, and coordination with the removal of existing overhead facilities.