Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Twin City's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Public Works Director
City Engineer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Twin City
The City of Twin City requests qualifications from professional engineering firms to provide a Preliminary Engineering Report (PER), design, and construction administration services for generator system improvements at municipal water and sewer facilities. The work may involve projects funded through federal programs (e.g., CDBG, GEFA, USDA) and the selected firm must satisfy HUD Section 3 and related federal requirements. The solicitation seeks firms with similar project experience and the ability to provide economic opportunities to low- and very low-income persons.
Posted Date
Dec 30, 2025
Due Date
Feb 6, 2026
Release: Dec 30, 2025
City of Twin City
Close: Feb 6, 2026
The City of Twin City requests qualifications from professional engineering firms to provide a Preliminary Engineering Report (PER), design, and construction administration services for generator system improvements at municipal water and sewer facilities. The work may involve projects funded through federal programs (e.g., CDBG, GEFA, USDA) and the selected firm must satisfy HUD Section 3 and related federal requirements. The solicitation seeks firms with similar project experience and the ability to provide economic opportunities to low- and very low-income persons.
AvailableCity of Twin City
Construction of : PART A-C (LRA FUNDS): The project will consist of patching, overlay with 584 TNs of recycled asphalt concrete 9.5 MM Superpave, 708 Gallons of bitum tack coat, restriping, traffic control and appurtenances. PART D-I (TSPLOST FUNDS): The project will consist of patching, overlay with 5,341 TNs of recycled asphalt concrete 9.5 MM Superpave, 6,474 Gallons of bitum tack coat, restriping, traffic control and appurtenances. PART J-P (GTIB FUNDS): The project will consist of patching, overlay with 1,726 TNs of recycled asphalt concrete 9.5 MM Superpave, 2,093 Gallons of bitum tack coat, restriping, traffic control and appurtenances.
Posted Date
Jul 24, 2025
Due Date
Aug 29, 2025
Release: Jul 24, 2025
City of Twin City
Close: Aug 29, 2025
Construction of : PART A-C (LRA FUNDS): The project will consist of patching, overlay with 584 TNs of recycled asphalt concrete 9.5 MM Superpave, 708 Gallons of bitum tack coat, restriping, traffic control and appurtenances. PART D-I (TSPLOST FUNDS): The project will consist of patching, overlay with 5,341 TNs of recycled asphalt concrete 9.5 MM Superpave, 6,474 Gallons of bitum tack coat, restriping, traffic control and appurtenances. PART J-P (GTIB FUNDS): The project will consist of patching, overlay with 1,726 TNs of recycled asphalt concrete 9.5 MM Superpave, 2,093 Gallons of bitum tack coat, restriping, traffic control and appurtenances.
City of Twin City
Service line material through minor excavation "pot-holing" on all water services 2" in dia. and smaller.
Posted Date
Aug 29, 2024
Due Date
Oct 1, 2024
Release: Aug 29, 2024
City of Twin City
Close: Oct 1, 2024
Service line material through minor excavation "pot-holing" on all water services 2" in dia. and smaller.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.