Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Toccoa
The City of Toccoa is soliciting bids for replacement of natural-gas pipelines on Broad Street, Big A Road, and Davis Avenue in Toccoa, Georgia. The work includes removing existing pipelines and installing new infrastructure, with bid and performance bonds required. Although the project is funded through a PHMSA infrastructure-safety grant, this opportunity is a construction procurement contract rather than a grant program, and bids are due before the August 27, 2026 opening.
Posted Date
Jul 21, 2026
Due Date
Aug 27, 2026
Release: Jul 21, 2026
City of Toccoa
Close: Aug 27, 2026
The City of Toccoa is soliciting bids for replacement of natural-gas pipelines on Broad Street, Big A Road, and Davis Avenue in Toccoa, Georgia. The work includes removing existing pipelines and installing new infrastructure, with bid and performance bonds required. Although the project is funded through a PHMSA infrastructure-safety grant, this opportunity is a construction procurement contract rather than a grant program, and bids are due before the August 27, 2026 opening.
AvailableCity of Toccoa
The City of Toccoa is soliciting bids for replacement of natural-gas pipelines on Broad Street, Big A Road, and Davis Avenue in Toccoa, Georgia. The work includes removing existing pipelines and installing new infrastructure, with bid and performance bonds required. Although the project is funded through a PHMSA infrastructure-safety grant, this opportunity is a construction procurement contract rather than a grant program, and bids are due before the August 27, 2026 opening.
Posted Date
Jul 21, 2026
Due Date
Aug 27, 2026
Release: Jul 21, 2026
City of Toccoa
Close: Aug 27, 2026
The City of Toccoa is soliciting bids for replacement of natural-gas pipelines on Broad Street, Big A Road, and Davis Avenue in Toccoa, Georgia. The work includes removing existing pipelines and installing new infrastructure, with bid and performance bonds required. Although the project is funded through a PHMSA infrastructure-safety grant, this opportunity is a construction procurement contract rather than a grant program, and bids are due before the August 27, 2026 opening.
AvailableCity of Toccoa
Wastewater Treatment Plant. Construction of a new influent structure with manual bar screen, stop gates, and overflow weir; conversion of an existing aerated pond to an equalization basin; mechanical or hydraulic dredging of an aerated pond; rehabilitation of an aerated pond with installation of a LemTec Biological Treatment Process; repurposing of the existing plant pump station to serve as the effluent pump station; and construction of a new effluent structure equipped with a polishing reactor, flow metering, and chemical feed systems for chlorination and dechlorination. The work further includes yard piping, valves, appurtenances, and all associated site work, electrical, structural, and instrumentation.
Posted Date
Mar 19, 2026
Due Date
Apr 30, 2026
Release: Mar 19, 2026
City of Toccoa
Close: Apr 30, 2026
Wastewater Treatment Plant. Construction of a new influent structure with manual bar screen, stop gates, and overflow weir; conversion of an existing aerated pond to an equalization basin; mechanical or hydraulic dredging of an aerated pond; rehabilitation of an aerated pond with installation of a LemTec Biological Treatment Process; repurposing of the existing plant pump station to serve as the effluent pump station; and construction of a new effluent structure equipped with a polishing reactor, flow metering, and chemical feed systems for chlorination and dechlorination. The work further includes yard piping, valves, appurtenances, and all associated site work, electrical, structural, and instrumentation.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Do not pursue; pivot immediately to a cooperative path.
Coops: Frequently procures through Sourcewell; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Entity: City of Toccoa, GA.
Sole source threshold: No documented threshold or pathway found; the city shows no evidence of approving sole source awards.
Board meetings and strategic plans from City of Toccoa
The Commission received various reports from members regarding local community events and projects. Key actions included the approval of a new Conflict of Interest and Code of Conduct Procurement Policy, the authorization to purchase four vehicles for the Police Department, and the adoption of the Georgia Municipal Association Direct Lease Program for financing equipment. A monthly financial report was presented. Additionally, following public comment regarding the schedule of the Ida Cox Concert Series, the Commission directed staff to re-establish the series for the months of June and July.
The City Commission held a meeting to address various municipal matters, including the receipt of audit reports and updates on community events from commissioners. The Commission imposed penalties, including a fine and license suspension, on a local business for underage alcohol sales. Public hearings were conducted regarding variance requests for property on Shady Street and Washington Street, both of which were approved. Additionally, the Commission declared a hydraulic extrication tool as surplus property for donation to the Pierce County Fire Department and approved rescheduling the second meeting in May due to the Memorial Day holiday.
The commission held a budget meeting to discuss the FY2027 Proposed Operating Budget, noting a decrease due to the completion of one-time capital projects while emphasizing ongoing operational and utility costs. Key discussion items included rising operational expenses, reserve requirements, and specific departmental requests such as additional Fire Department staffing, police shift differentials, and equipment purchases for Public Works, Water & Wastewater, Natural Gas, and Solid Waste. Additionally, the commission discussed employee incentives and benefits, landscaping and beautification improvements, Lake Toccoa facility operations, fee adjustments, and various contracts and funding authorizations, including support for the 250th Anniversary banners and the Humane Shelter.
The commission convened to consider and approve bids for third-party inspections regarding the Ritz Addition project. The commission voted unanimously to accept the proposal from L.E. Burnett & Associates, LLC for $22,870.00.
The commission received reports regarding local development projects at the Ritz and community events commemorating the Band of Brothers. Discussions included the Fire Department's emergency response, a presentation from the All Airborne Battalion regarding Camp Toccoa training and historical preservation, and Humane Shelter operational statistics. The commission issued a proclamation for American Legion Post 104 Day and approved a lease agreement with the Norfolk Southern Railway.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Toccoa's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge