Summary
Wastewater Treatment Plant. Construction of a new influent structure with manual bar screen, stop gates, and overflow weir; conversion of an existing aerated pond to an equalization basin; mechanical or hydraulic dredging of an aerated pond; rehabilitation of an aerated pond with installation of a LemTec Biological Treatment Process; repurposing of the existing plant pump station to serve as the effluent pump station; and construction of a new effluent structure equipped with a polishing reactor, flow metering, and chemical feed systems for chlorination and dechlorination. The work further includes yard piping, valves, appurtenances, and all associated site work, electrical, structural, and instrumentation.