Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Thomson
Developing a service line inventory as mandated by the Lead and Copper Rule. The City is requesting the service of a qualified contractor to investigate and record service line materials using soft dig techniques. Contractor shall pothole at the water main to identify the connector material where feasible without removing existing pavement/sidewalk. Bidder agrees to furnish all materials and equipment and to perform all labor necessary to pothole and identify the existing service line material on ±5,560 metered services and identify connector material when feasible/requested. Contractor will be provided instructions for entering data into ESRI's ArcGIS Online (AGOL) GIS platform using a license provided by the Owner and Engineer with an iOS or Android mobile device provided by the Contractor. Time allotted for completion of work is 120 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
Posted Date
Mar 13, 2026
Due Date
Apr 13, 2026
Release: Mar 13, 2026
City of Thomson
Close: Apr 13, 2026
Developing a service line inventory as mandated by the Lead and Copper Rule. The City is requesting the service of a qualified contractor to investigate and record service line materials using soft dig techniques. Contractor shall pothole at the water main to identify the connector material where feasible without removing existing pavement/sidewalk. Bidder agrees to furnish all materials and equipment and to perform all labor necessary to pothole and identify the existing service line material on ±5,560 metered services and identify connector material when feasible/requested. Contractor will be provided instructions for entering data into ESRI's ArcGIS Online (AGOL) GIS platform using a license provided by the Owner and Engineer with an iOS or Android mobile device provided by the Contractor. Time allotted for completion of work is 120 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
AvailableCity of Thomson
Perform all labor necessary to modify the existing Usry Pond Raw Water Pump Station and the Raw Water Intake as shown on the Drawings and as specified herein, including, but not limited to, rehabilitation and improvements to the existing raw water pump station building and vertical turbine pumps, construction of a new chemical feed building, modifications to the existing raw water intake structure at Usry Pond, replacement of chemical feed systems and some chemical piping, and electrical improvements and repairs at the Usry Pond Raw Water Pump Station including a new motor control center. Work also includes mobilization/demobilization, earthwork, bonds, insurance, electrical, instrumentation, SCADA, mechanical, piping, valves, coatings, HVAC, soil erosion & sediment control, and all other work and appurtenances necessary for completion of the work as shown on the Drawings and as specified in the Contract Documents.
Posted Date
-
Due Date
Mar 3, 2026
City of Thomson
Close: Mar 3, 2026
Perform all labor necessary to modify the existing Usry Pond Raw Water Pump Station and the Raw Water Intake as shown on the Drawings and as specified herein, including, but not limited to, rehabilitation and improvements to the existing raw water pump station building and vertical turbine pumps, construction of a new chemical feed building, modifications to the existing raw water intake structure at Usry Pond, replacement of chemical feed systems and some chemical piping, and electrical improvements and repairs at the Usry Pond Raw Water Pump Station including a new motor control center. Work also includes mobilization/demobilization, earthwork, bonds, insurance, electrical, instrumentation, SCADA, mechanical, piping, valves, coatings, HVAC, soil erosion & sediment control, and all other work and appurtenances necessary for completion of the work as shown on the Drawings and as specified in the Contract Documents.
City of Thomson
Seeking qualified licensed and bonded collection agencies for the purpose of collecting outstanding debts owed to the municipality. The selected collection agency will be responsible for: Identifying, contacting, and pursuing collection of delinquent accounts. Reporting on collection efforts and outcomes on a regular basis. Maintaining accurate records and providing detailed reporting. Ensuring compliance with the Fair Debt Collection Practices Act (FDCPA) and other relevant regulations. Providing training or resources for local government staff on debt collection policies and procedures, if necessary.
Posted Date
Oct 1, 2025
Due Date
Nov 21, 2025
Release: Oct 1, 2025
City of Thomson
Close: Nov 21, 2025
Seeking qualified licensed and bonded collection agencies for the purpose of collecting outstanding debts owed to the municipality. The selected collection agency will be responsible for: Identifying, contacting, and pursuing collection of delinquent accounts. Reporting on collection efforts and outcomes on a regular basis. Maintaining accurate records and providing detailed reporting. Ensuring compliance with the Fair Debt Collection Practices Act (FDCPA) and other relevant regulations. Providing training or resources for local government staff on debt collection policies and procedures, if necessary.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; not supported by past practice—move on.
Coops: Default path; use the city’s formal solicitation process. Tip: For future acceleration, suggest GA DOAS statewide contracts or coops (Sourcewell, HGACBuy, GSA). Buyer hasn’t historically used coops, but you can encourage them to explore these procurement programs as future options.
City of Thomson: No evidence of sole source awards in public records; treat this path as non-viable. No publicly documented dollar thresholds identified.
Board meetings and strategic plans from City of Thomson
The Mayor and Town Council Work Session agenda covered several discussion points under Old Business, including the status update on the Fire Fee & Services Contract, Municipal Property Tax, Building Inspections & Certificates of Occupancy, Annexation discussions, and potential Planning Commission Board Nominees. New Business items included reviewing three quotes for the Gym Gutter project, a Construction/Zoning Application for 181 McGahee Ave., and discussion regarding the Chamber of Commerce Banquet.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Thomson's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database