Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Only consider for $10k–$30k with a waiver approved by the City Controller and City Manager; above $30,000 pivot to coops.
Coops: If your product is on MiDeal, Sourcewell, GSA Advantage, or OMNIA Partners, route via the department head and buy direct (coops exempt formal bidding).
City of Sturgis rarely uses sole source above the $30,000 formal bidding threshold. For purchases between $10,000 and $30,000, a sole source waiver is possible with approval from the City Controller and City Manager.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Sturgis's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
IT Director
Director of Public Safety
Human Resources Manager
Building Inspector
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Sturgis
Removal and replacement of the interior and exterior entrance doors and surronding glazing with high efficiency glass.
Posted Date
Dec 15, 2025
Due Date
Jan 26, 2026
Release: Dec 15, 2025
City of Sturgis
Close: Jan 26, 2026
Removal and replacement of the interior and exterior entrance doors and surronding glazing with high efficiency glass.
AvailableCity of Sturgis
The overall scope of this project consists of the construction of a new 69kV:12.5kV dual transformer electrical distribution substation. Construction will consist of all site preparation, installation of two (2) 69kV circuit switchers, two (2) 10/12.5 MVA power transformers, three (3) 69kV breakers, six (6) 15kV breakers, six (5) 69kV PT’s for relaying & metering, one (1) 15kV main & transfer bus structure, all equipment foundations, conduit, fence and ground grid, plus a new control house, control panels, battery system. Transmission & Distribution wood pole top assemblies, wooden pole riser construction (including conduit and cable installation), plus site restoration and transmission line removals are included in this contract.
Posted Date
Sep 8, 2025
Due Date
Oct 27, 2025
Release: Sep 8, 2025
City of Sturgis
Close: Oct 27, 2025
The overall scope of this project consists of the construction of a new 69kV:12.5kV dual transformer electrical distribution substation. Construction will consist of all site preparation, installation of two (2) 69kV circuit switchers, two (2) 10/12.5 MVA power transformers, three (3) 69kV breakers, six (6) 15kV breakers, six (5) 69kV PT’s for relaying & metering, one (1) 15kV main & transfer bus structure, all equipment foundations, conduit, fence and ground grid, plus a new control house, control panels, battery system. Transmission & Distribution wood pole top assemblies, wooden pole riser construction (including conduit and cable installation), plus site restoration and transmission line removals are included in this contract.
City of Sturgis
Floor coating installation in the apparatus bays and tank room. Existing coatings to be fully removed and replaced per the included specification.
Posted Date
Sep 2, 2025
Due Date
Sep 15, 2025
Release: Sep 2, 2025
City of Sturgis
Close: Sep 15, 2025
Floor coating installation in the apparatus bays and tank room. Existing coatings to be fully removed and replaced per the included specification.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.