CityIL
Posted
Oct 21, 2026
Nov 10, 2026
2026 Sanitary Sewer Lining Rehabilitation Project RFP
Construction of 2026 sanitary sewer lining rehabilitation project.
Description: Work includes approx 3,600 LF of 8" sanitary sewer CIPP lining, steam; 620 LF of 18" sanitary sewer CIPP lining, steam; 132 EA lateral mainline connections; 3,600 LF of 8" sanitary sewer CIPP lining, UV.
City · MI, US
Solicitation files and supporting documents for this bid.
These related opportunities are still open for bidding.
CityIL
Posted
Oct 21, 2026
Nov 10, 2026
Construction of 2026 sanitary sewer lining rehabilitation project.
Green Land-Marlborough Joint (Sewer) Authority
Special DistrictPA
Posted
Oct 14, 2026
Nov 13, 2026
Cured-in-place lining of 8" diameter and 12" diameter gravity sanitary sewers, gravity lateral connection repairs, traffic control and ancillary work
CityOH
Posted
Oct 15, 2026
Nov 12, 2026
Includes, but is not limited to, the rehabilitation of the City sanitary system from rehabilitation of 4,516 LF of existing 8" – 15" sanitary sewer using cured-in-place pipe, rehabilitation of 252 vertical feet of existing manholes, 2, 10" open cut point repairs and all other appertaining work including maintenance of access to residences and protection of trees and landscape located adjacent to the work, with an emphasis on regular, clear communication with the City and affected residents.
CityOH
Posted
Oct 8, 2026
Oct 26, 2026
Provide storm sewer rehabilitation via pvc lining.
Decision makers connected to this RFP from City of Sturgis.