Third and Fern Ridge Safe Routes To School
Posted
Sep 3, 2026
Sep 24, 2026
Remove and replace approx. 207 LF of curb and gutter, construct 1,124 SF of concrete sidewalks including three ADA curb ramps, perform 1,093 SY of cold plane pavement removal, place 114 tons of asphalt pavement, construct a 42" diameter signal support drilled shaft and install traffic signal, and install associated pavement legends and striping.