HOLLISTER STREET UTILITY IMPROVEMENTS RFP
Posted
Nov 18, 2026
Dec 10, 2026
The City of Stayton seeks a contractor to perform utility and street work on Hollister Street including storm drain, water main, service connections, hydrants, catch basins, and asphalt patching as described in the Contract Documents. Work includes construction of twelve catch basins, installation of approximately 190 linear feet of storm drain pipe, replacement and installation of water mains and services (including 8-inch and 6-inch piping, four service connections, and two hydrants), and about 260 square yards of Level 2 asphalt patching, plus related incidental work. Bidders must comply with the City of Stayton Public Works Standard Construction Specifications and statutory public works requirements for bonds, prevailing wages, certifications, and subcontractor disclosures.