Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $5,000, use sole source. Deprioritize—approvals are unlikely; pivot back to coops immediately.
Coops: Lead with Sourcewell or OMNIA Partners to bypass formal bidding. Confirm your product is on-contract and coordinate with procurement and the requesting department.
City of Salem, UT: No clear sole source pathway in practice; high procedural rigidity.
Practical note: Attempts are likely to fail and waste time—pivot to cooperative contracts.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Salem's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Building Official
City Manager
Finance Director
City Engineer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Salem
Work includes construction of a new cast-in-place pressure reducing valve (PRV) vault and associated piping and appurtenances. The vault is to be a below grade cast-in-place concrete structure. The vault will include two PRVs, valves, flowmeters, pressure relief valves, and associated piping. The project includes the installation of DI pipe, PVC pipe, RCP pipe, storm drain manholes, and associated site restoration.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
City of Salem
Close: Feb 5, 2026
Work includes construction of a new cast-in-place pressure reducing valve (PRV) vault and associated piping and appurtenances. The vault is to be a below grade cast-in-place concrete structure. The vault will include two PRVs, valves, flowmeters, pressure relief valves, and associated piping. The project includes the installation of DI pipe, PVC pipe, RCP pipe, storm drain manholes, and associated site restoration.
AvailableCity of Salem
Salem City Public Works Department seeks a construction manager/general contractor for preconstruction services at the Salem City Water Reclamation Facility. The project involves preconstruction and construction services using the CM/GC delivery method, with a budget of $5.2 million. The goal is to achieve substantial completion by December 30, 2025, with a focus on performance, quality, cost, risk, and safety. The proposer will be responsible for developing a GMP proposal and managing construction, startup, commissioning, and warranty services.
Posted Date
Sep 30, 2024
Due Date
Oct 30, 2024
Release: Sep 30, 2024
City of Salem
Close: Oct 30, 2024
Salem City Public Works Department seeks a construction manager/general contractor for preconstruction services at the Salem City Water Reclamation Facility. The project involves preconstruction and construction services using the CM/GC delivery method, with a budget of $5.2 million. The goal is to achieve substantial completion by December 30, 2025, with a focus on performance, quality, cost, risk, and safety. The proposer will be responsible for developing a GMP proposal and managing construction, startup, commissioning, and warranty services.
City of Salem
Install 1,300 LF of curb and gutter, 13,000 SF of asphalt trail, 3,900 SF of stamped concrete, and storm drain facilities including but not limited to the potholing and locating existing utilities, sawcutting, removal and proper disposal of existing asphalt, installation of stormwater detention facilities and restoration of surfaces behind the improvements.
Posted Date
Jul 19, 2025
Due Date
Jul 30, 2025
Release: Jul 19, 2025
City of Salem
Close: Jul 30, 2025
Install 1,300 LF of curb and gutter, 13,000 SF of asphalt trail, 3,900 SF of stamped concrete, and storm drain facilities including but not limited to the potholing and locating existing utilities, sawcutting, removal and proper disposal of existing asphalt, installation of stormwater detention facilities and restoration of surfaces behind the improvements.