Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install 1,300 LF of curb and gutter, 13,000 SF of asphalt trail, 3,900 SF of stamped concrete, and storm drain facilities including but not limited to the potholing and locating existing utilities, sawcutting, removal and proper disposal of existing asphalt, installation of stormwater detention facilities and restoration of surfaces behind the improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Project consists of the construction of new trail connectors and drainage repairs to existing trail elements. The Douglas Loop Trail Improvements project entails expansion of the paving to fill gaps in the existing walking trail. Additionally, enhancements such as bollards, restriping, benches, ADA ramps, crosswalks, speed humps, new plantings, and a water fountain are planned.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The Project consists of the construction of new trail connectors and drainage repairs to existing trail elements. The Douglas Loop Trail Improvements project entails expansion of the paving to fill gaps in the existing walking trail. Additionally, enhancements such as bollards, restriping, benches, ADA ramps, crosswalks, speed humps, new plantings, and a water fountain are planned.
AvailableRelease: Nov 21, 2025
Close: Jan 22, 2026
Trail improvements.
AvailableThe Town of Danville is soliciting bids for construction of Iron Horse Trail Crossing Improvements. Work includes constructing raised crossings/intersections with ADA curb ramp upgrades, high-visibility striping/markings and signage, and related drainage improvements, coordinated with the East Bay Regional Park District. Bids close on February 5, 2026 at 2:00 PM local time.
Posted Date
-
Due Date
Feb 5, 2026
Release: -
Close: Feb 5, 2026
The Town of Danville is soliciting bids for construction of Iron Horse Trail Crossing Improvements. Work includes constructing raised crossings/intersections with ADA curb ramp upgrades, high-visibility striping/markings and signage, and related drainage improvements, coordinated with the East Bay Regional Park District. Bids close on February 5, 2026 at 2:00 PM local time.
AvailableThe work shall consist essentially of the following items: replacement of trail bridge decking and railing and repairs to failed substructure elements as directed.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
The work shall consist essentially of the following items: replacement of trail bridge decking and railing and repairs to failed substructure elements as directed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis