Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Saint Cloud
Lift station installation and rehabilitation services. Lift station installation services - This service shall apply to the installation of new lift stations. The services include, but shall not be limited to, the following: A. Bedding & backfill for structure B. Furnishing and installing concrete pad(s) C. Furnishing and installing precast polymer wet well and appurtenances D. Furnishing and installing various piping, valves, and fittings E. Furnishing and installing odor control system and emergency bypass pump(s) F. Furnishing and installing manholes; see attached file.
Posted Date
Jun 12, 2026
Due Date
Jul 21, 2026
Release: Jun 12, 2026
City of Saint Cloud
Close: Jul 21, 2026
Lift station installation and rehabilitation services. Lift station installation services - This service shall apply to the installation of new lift stations. The services include, but shall not be limited to, the following: A. Bedding & backfill for structure B. Furnishing and installing concrete pad(s) C. Furnishing and installing precast polymer wet well and appurtenances D. Furnishing and installing various piping, valves, and fittings E. Furnishing and installing odor control system and emergency bypass pump(s) F. Furnishing and installing manholes; see attached file.
AvailableCity of Saint Cloud
Work includes 735 LF staked silt fence; 1 LS demo existing roadway for storm connection;' 155 CY cut; 1,565 CY import fill; 1 EA temporary construction entrance; 1 EA type e inlet; 81 LF 18" RCP pipe; 2 EA 18" storm mes; 1 LS miscellaneous fittings/cleaning/inspection; 1 EA core into existing storm structure; 1 LS dewatering; 1 LS repair existing pavement after storm installation; 2,544 SY 1. 5" type sp-9. 5 asphalt; 2,544 sy 6" limerock base; 2,544 SY 12" stabilized subgrade (lbr > 40); 713 LF type d curb; 512 LF 4" concrete sidewalk (5' wide); 1 LS pavement marking/signage. See attached file.
Posted Date
Jun 7, 2026
Due Date
Jul 9, 2026
Release: Jun 7, 2026
City of Saint Cloud
Close: Jul 9, 2026
Work includes 735 LF staked silt fence; 1 LS demo existing roadway for storm connection;' 155 CY cut; 1,565 CY import fill; 1 EA temporary construction entrance; 1 EA type e inlet; 81 LF 18" RCP pipe; 2 EA 18" storm mes; 1 LS miscellaneous fittings/cleaning/inspection; 1 EA core into existing storm structure; 1 LS dewatering; 1 LS repair existing pavement after storm installation; 2,544 SY 1. 5" type sp-9. 5 asphalt; 2,544 sy 6" limerock base; 2,544 SY 12" stabilized subgrade (lbr > 40); 713 LF type d curb; 512 LF 4" concrete sidewalk (5' wide); 1 LS pavement marking/signage. See attached file.
AvailableCity of Saint Cloud
Provide comprehensive facility condition assessment (fca) of all city-owned buildings. The primary objective is to evaluate the current state of these facilities, identify deferred maintenance requirements, and estimate the remaining useful life of major systems. Qualified respondents must demonstrate significant experience in performing assessments for municipal or institutional clients with diverse building portfolios. The final deliverable will provide a prioritized capital improvement plan designed to guide facility reinvestment decisions and serve as a cornerstone for the city s long-term capital and maintenance strategy.
Posted Date
Jun 7, 2026
Due Date
Jul 9, 2026
Release: Jun 7, 2026
City of Saint Cloud
Close: Jul 9, 2026
Provide comprehensive facility condition assessment (fca) of all city-owned buildings. The primary objective is to evaluate the current state of these facilities, identify deferred maintenance requirements, and estimate the remaining useful life of major systems. Qualified respondents must demonstrate significant experience in performing assessments for municipal or institutional clients with diverse building portfolios. The final deliverable will provide a prioritized capital improvement plan designed to guide facility reinvestment decisions and serve as a cornerstone for the city s long-term capital and maintenance strategy.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If the solution is proprietary or critical to continuity of service (e.g., 911/public safety), pursue Sole Source; otherwise pivot back to cooperatives.
Coops: Lead with cooperatives (Sourcewell, OMNIA Partners, or NCPA) and route through a familiar reseller (e.g., SHI or Safeware) to fast-track.
Use only when the product is genuinely proprietary or essential to a critical city service (e.g., public safety/911).
Actions: partner with the department head to build the business case and complete the sole source justification for Purchasing; monitor City Council agendas for the approving resolution.
Track vendor wins and renewal opportunities
City of Saint Cloud
This document is a Hootsuite payment invoice issued to Maryemma Bachelder of the City of St. Cloud for an annual Professional Plan subscription. The invoice, dated November 28, 2023, covers the service period from November 28, 2023, to November 27, 2024. The total amount paid for the service, after a 20% discount, is US$950.40.
Effective Date
Nov 28, 2023
Expires
Effective: Nov 28, 2023
City of Saint Cloud
Expires:
This document is a Hootsuite payment invoice issued to Maryemma Bachelder of the City of St. Cloud for an annual Professional Plan subscription. The invoice, dated November 28, 2023, covers the service period from November 28, 2023, to November 27, 2024. The total amount paid for the service, after a 20% discount, is US$950.40.
City of Saint Cloud
This document details a Purchase Order (PO #084614) from the City of St. Cloud, Florida, to SurveyMonkey Inc. for an 'Advantage Annual Plan'. The PO is dated January 14, 2025, and includes comprehensive terms and conditions. An accompanying invoice (Invoice #46386326), dated December 31, 2024, specifies the service period from December 31, 2024, to December 30, 2025, for a total cost of $468. The service is designated for the City of St. Cloud Fire Department.
Effective Date
Dec 31, 2024
Expires
Effective: Dec 31, 2024
City of Saint Cloud
Expires:
This document details a Purchase Order (PO #084614) from the City of St. Cloud, Florida, to SurveyMonkey Inc. for an 'Advantage Annual Plan'. The PO is dated January 14, 2025, and includes comprehensive terms and conditions. An accompanying invoice (Invoice #46386326), dated December 31, 2024, specifies the service period from December 31, 2024, to December 30, 2025, for a total cost of $468. The service is designated for the City of St. Cloud Fire Department.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from City of Saint Cloud
The council meeting addressed the approval of candidate names for the upcoming primary and general election ballots, ensuring compliance with residency requirements. Additionally, the council discussed and approved a transition for the city's tagline, deciding to discontinue the previous tagline and officially adopt 'Soldier City' as the city's primary tagline, with instructions for staff to implement this change across city materials and assets in a cost-effective, phased manner.
The meeting focused on the consideration and approval of two requests for the reduction of code enforcement liens. In both cases, the magistrate authorized a reduction of fines and administrative costs, contingent upon payment being made within 30 days. Failure to meet this deadline will result in the reinstatement of the original fine amounts.
The commission discussed a conditional use request for a local barber shop to provide on-site consumption of beer and wine as an accessory service. Additionally, the commission reviewed a proposed land development code amendment aimed at removing restrictions on restaurant seating, entertainment, and signage to enhance dining experiences throughout the city.
The board discussed a request for the demolition and new construction of a property located at 1110 Minnesota Avenue. The project, which involves a site within a historic district, was reviewed for its compliance with historic preservation standards and the impact of the proposed design on the surrounding neighborhood. The board approved the request with specific conditions, including a requirement for the project to utilize the alternate front elevation design and strict protocols for handling any potential discovery of historical artifacts or human remains during excavation.
The hearing addressed a request for a status update regarding an order imposing fines and creating a lien on a property. The discussion focused on the respondent's failure to obtain a necessary building permit and progress made on addressing fire safety issues. The respondent raised concerns regarding the city's permitting process and requirements for subcontractor registration, while the magistrate emphasized that the primary focus of the hearing was determining code compliance and resolving the outstanding permitting issues.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Saint Cloud's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge