Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Red Lodge
The City of Red Lodge is soliciting sealed bids for its 2026 Water Rehabilitation project, to be submitted electronically via QuestCDN vBid. The work comprises five schedules including installation and replacement of approximately 6,500+ linear feet of 8‑inch PVC/HDPE water mains under/along various corridors, with associated services, valves, and hydrants. Bids are due by 2:00 PM local time on April 16, 2026, with a pre‑bid conference on April 2, 2026 at Red Lodge City Hall.
Posted Date
-
Due Date
Apr 16, 2026
City of Red Lodge
Close: Apr 16, 2026
The City of Red Lodge is soliciting sealed bids for its 2026 Water Rehabilitation project, to be submitted electronically via QuestCDN vBid. The work comprises five schedules including installation and replacement of approximately 6,500+ linear feet of 8‑inch PVC/HDPE water mains under/along various corridors, with associated services, valves, and hydrants. Bids are due by 2:00 PM local time on April 16, 2026, with a pre‑bid conference on April 2, 2026 at Red Lodge City Hall.
AvailableCity of Red Lodge
Project consists of curb and gutter, drive approaches, ada ramps, asphalt pavement section, and some sidewalk improvements to approx. , 14 blocks. Work includes, 7,125 CY of excavation and embankment; 17,835 SY of geotextile separation fabric; 5,410 CY of crushed base course; 17,835 SY of geogrid; 2,690 ton of 3' asphalt pavement; 6,145 LF of concrete curb and gutter; 70 SY of concrete valley gutter & curb fillet; 580 SY of concrete sidewalk; 130 LF of 12" pvc storm drain; 7 SY of 6' concrete dumpster pad removal and replacement.
Posted Date
Jul 24, 2025
Due Date
Aug 14, 2025
Release: Jul 24, 2025
City of Red Lodge
Close: Aug 14, 2025
Project consists of curb and gutter, drive approaches, ada ramps, asphalt pavement section, and some sidewalk improvements to approx. , 14 blocks. Work includes, 7,125 CY of excavation and embankment; 17,835 SY of geotextile separation fabric; 5,410 CY of crushed base course; 17,835 SY of geogrid; 2,690 ton of 3' asphalt pavement; 6,145 LF of concrete curb and gutter; 70 SY of concrete valley gutter & curb fillet; 580 SY of concrete sidewalk; 130 LF of 12" pvc storm drain; 7 SY of 6' concrete dumpster pad removal and replacement.
City of Red Lodge
895 LF - 10" pre-liner installation; 12" pre-liner installation; 1,790 LF - 10" cured-in-place pipe (CIPP) sewer rehabilitation; 1,080 LF - 12" cured-in-place pipe (CIPP) sewer rehabilitation; 10 ea - manhole lining; 4 ea - manhole drop inlet bowl. See outside link.
Posted Date
May 22, 2025
Due Date
Jun 12, 2025
Release: May 22, 2025
City of Red Lodge
Close: Jun 12, 2025
895 LF - 10" pre-liner installation; 12" pre-liner installation; 1,790 LF - 10" cured-in-place pipe (CIPP) sewer rehabilitation; 1,080 LF - 12" cured-in-place pipe (CIPP) sewer rehabilitation; 10 ea - manhole lining; 4 ea - manhole drop inlet bowl. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $80,000, use sole source only if the City explicitly confirms eligibility; otherwise work directly with the requesting department for a direct purchase order. Ensure your Business Registration Certificate (Ordinance O878) is completed.
Coops: If the buyer is open to alternatives, mention MT’s State Cooperative Purchasing Program, NASPO ValuePoint, Sourcewell, HGACBuy; buyer hasn’t historically used coops/resellers, but you can encourage them to explore these procurement programs as future options.
City of Red Lodge: No evidence of an active sole source pathway—deprioritize. Complete the City’s Business Registration Certificate (Ordinance O878) before any purchase.
Board meetings and strategic plans from City of Red Lodge
The meeting focused on logistical planning for an upcoming public meeting, including discussion of venue reservations, AV requirements, and catering arrangements. The committee discussed the presentation agenda, which will involve an overview of the urban renewal district, its purpose, and future development visions. Additionally, the board coordinated the selection of a moderator to lead the public engagement session.
The committee reviewed current resort tax collections, addressing a fourth-quarter decrease as a potential reporting discrepancy rather than a decline, and discussed cash versus accrual accounting methods. Key discussions involved the potential expansion of resort tax fund uses to include workforce housing, public transportation, and emergency services. The Public Works Director provided a budget overview for parks and street maintenance projects, including equipment needs. Additionally, the committee approved a public survey regarding resort tax fund usage, with plans to distribute the document for public input while maintaining budget transparency.
The committee meeting agenda covers several key items, including a discussion on the composition of the Main Street Board and the pursuit of a Public Health & Safety grant application. Additional business includes determining budget allocations for the construction of a new Police Department facility, receiving an update on the annexation process of the City of Red Lodge by the Red Lodge Rural Fire Department, and establishing a timeline for the Public Health & Safety Mill Levy ballot. The committee will also review its ongoing priorities, projects, and general timeline.
The meeting encompassed several updates regarding ongoing public works and infrastructure projects. Discussions included delays in receiving parts for water pressure reducing valves, the status of the 2026 water improvement project bidding, and updates on sewer projects. The committee reviewed a proposed city-led stormwater project to address drainage near baseball fields. Significant attention was given to park improvements, including the installation of a water refill station and skateboard tool station at the skate park, as well as cost-estimate options for tennis court construction at Coal Miners Park. Additionally, the committee discussed material changes for the Pride Park project, pedestrian crossing signs for local trails, ongoing pothole patching, and revisions to sidewalk program applications.
The committee discussed the approval of an MOU with the rodeo association regarding the maintenance and use of Rodeo Park, including specifics on weed control, mowing, and liability insurance. The committee also received an update on the tennis court project, reviewing various design and excavation alternatives presented by the engineering firm, and discussed the next steps for finalizing project drawings and cost estimates.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Red Lodge's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database