Removal and Replacement of Drainage Culverts RFP
Aug 26, 2026
Closes
Sep 9, 2026
Project involves saw cutting the existing asphalt, removing the existing culvert, installing new culvert per the manufacture's recom- mendation and the contract specification, backfilling with ctb and patching of asphalt. Tail ditches on either side of the roadway will need to graded so the pipe flows freely.