Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Piperton
Sale of surplus real property.
Posted Date
Oct 29, 2025
Due Date
Dec 9, 2025
Release: Oct 29, 2025
City of Piperton
Close: Dec 9, 2025
Sale of surplus real property.
City of Piperton
Project consists of 4,190 LF of 12" DIP and HDPE water main, including valves, hydrants, meters, and appurtenances. The project include jack and bore. Work includes, 2,725 lf of Water Main, Ductile Iron 12"; 1,175 lf of Water Main, HDPE 12"; 110 lf of Casing and Carrier Pipe, by Jack and Bore 24" Steel with 12" RJ DIP; 235 LF of Water Main, by Horizontal Directional Drill 12" HDPE (Sta. 22+65 to Sta. 25+00); 150 Lf of Water Service Pipe 3/4" by Open Cut, 50 lf of 3/4" with 2" Casing by HDD; 50 lf of 1" by Open Cut; 275 lf of 1" with 2" Casing by HDD; 50 lf of 2" by Open Cut.
Posted Date
Jul 8, 2025
Due Date
Jul 24, 2025
Release: Jul 8, 2025
City of Piperton
Close: Jul 24, 2025
Project consists of 4,190 LF of 12" DIP and HDPE water main, including valves, hydrants, meters, and appurtenances. The project include jack and bore. Work includes, 2,725 lf of Water Main, Ductile Iron 12"; 1,175 lf of Water Main, HDPE 12"; 110 lf of Casing and Carrier Pipe, by Jack and Bore 24" Steel with 12" RJ DIP; 235 LF of Water Main, by Horizontal Directional Drill 12" HDPE (Sta. 22+65 to Sta. 25+00); 150 Lf of Water Service Pipe 3/4" by Open Cut, 50 lf of 3/4" with 2" Casing by HDD; 50 lf of 1" by Open Cut; 275 lf of 1" with 2" Casing by HDD; 50 lf of 2" by Open Cut.
City of Piperton
Work consists of installing approx. 2,120 LF of 10" sewer main (5 to 30 feet deep), 1,410 LF of 8" sewer main (8-15 feet deep), 13 manholes, 15 service taps, and associated erosion control, traffic control, pavement / shoulder restoration, and seeding / sodding.
Posted Date
Mar 26, 2025
Due Date
Apr 15, 2025
Release: Mar 26, 2025
City of Piperton
Close: Apr 15, 2025
Work consists of installing approx. 2,120 LF of 10" sewer main (5 to 30 feet deep), 1,410 LF of 8" sewer main (8-15 feet deep), 13 manholes, 15 service taps, and associated erosion control, traffic control, pavement / shoulder restoration, and seeding / sodding.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable here—pivot to a coop or prepare for a formal sealed bid (> $25,000).
Coops: If your product is on a cooperative (Sourcewell preferred), route the purchase that way; otherwise, if over $25,000, expect a formal sealed bid.
City of Piperton has no evidence of sole source contracting. The city adheres to a formal sealed bid process for purchases over $25,000.
Board meetings and strategic plans from City of Piperton
The board discussed proposed operating hours and fishing regulations for the park, including the potential for requiring a city permit for fishing and limitations on boat usage. An update was provided on the status of existing and future grants for park development and trail design. Discussions also included the necessity for park regulations concerning firearms and weapons, liability waivers, the implementation of donation programs such as a donation wall, and the installation of appropriate safety signage.
The board discussed several departmental reports, including updates on financial performance, building permits, public works infrastructure, fire department calls, police statistics, and planning commission activities. They approved a professional services agreement for an audit of financial records and accepted a fire equipment grant. Additionally, the board held public hearings and passed ordinances related to sewer system regulations, the limitation of visible operable vehicles on private property, and amendments to zoning ordinances concerning fence heights and signage area. Further discussion took place regarding road paving concerns and required emergency repairs for the Russell Road bridge.
The board meeting agenda includes an update on Piperton activities, projects, and meetings attended, as well as a discussion regarding old or new business.
The commission reviewed and recommended approval for Ordinance No. 418-26 regarding updates to the zoning ordinance, specifically concerning front yard fence height allowances and residential sign square footage requirements for different lot sizes. Additionally, the committee discussed potential changes to gateway signage materials and size, and received updates regarding the timeline for sewer installation in Greenbrier and ongoing efforts to address road paving and base construction issues.
The board received an update regarding the status of a grant, which has been signed and uploaded to the portal. Discussions included the upcoming process for requesting an RFQ for a design firm to manage the trail system project, including ADA compliance and lighting, as well as the administrative role of the Mid-South Development District in ensuring reimbursement compliance.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Piperton's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge