Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Nitro
Provide roof replacement work, replace current built-up-roof (bur with tar & gravel & replace flashing, edge metals, parapets and roof drains. Replace waterproof membrane, scuppers, parapet walls, edge metals, flashing & drains. Replace waterproof membrane, scuppers, parapet walls, edge metals, flashing & drains. Repair / replace exhaust hood cap to kitchen ventilation system. Build a new roof over existing salt shed. Replace (6) obsolete goodman rooftop hvac units with like units and replace (3) rheem coils that have hail damage.
Posted Date
Apr 5, 2026
Due Date
Apr 17, 2026
Release: Apr 5, 2026
City of Nitro
Close: Apr 17, 2026
Provide roof replacement work, replace current built-up-roof (bur with tar & gravel & replace flashing, edge metals, parapets and roof drains. Replace waterproof membrane, scuppers, parapet walls, edge metals, flashing & drains. Replace waterproof membrane, scuppers, parapet walls, edge metals, flashing & drains. Repair / replace exhaust hood cap to kitchen ventilation system. Build a new roof over existing salt shed. Replace (6) obsolete goodman rooftop hvac units with like units and replace (3) rheem coils that have hail damage.
AvailableCity of Nitro
One section on county road 10 x 250-Starts halfway down county road-Mill & pave One section on Michigan Ave South, above St Albans bridge, where the drain was replaced. 12 x 30, two inches of base (It's marked), then apply two inches of topcoat on the total existing length of 12 x 110 (It's marked) One section on Dupont south above the St. Albans bridge, 16 x30 two-inch base (It's marked), then two-inch topcoat the entire length of 16 x 110-(it's marked) Kanawha Ave at the end of Kapok St, that has never been paved-14 x 240-three inches of base (priority) Ivy St from Main Ave to Dupont Ave- 14 x 238-Mill and pave 15th east on 3rd Ave – pave 15th St to 17th St 15 x 360-Mill & pave Top of Short St, one large section (priority)13 x 310-Mill and pave 9th St entrance from 1st Ave 16 x 20 and from house number 921 to the top of the bank and flare out-26 x 180 (PRIORITY)-Mill and pave 12th St entrance 32 x 24-Mill and pave 12th St from house number 1223 to 1232 – 26 x 193-mill two inches and replace two inches (PRIORITY) 15th St from 2nd Ave 26 x36-mill two inches replace two inches -house number 1505 -27 x 160 to house number 1505-excavate or mill 10 inches full depth area and install 6 inches of stone-replace with 2.05 base and 1.5 top (PRIORITY) 16th St at top, starting at house number 1635 at the end of the garage, and flare out to the wall on 3rd Ave-16 x 5O – Mill and pave 19th St at crossing end at 2nd Ave one large section – 10 x 32 – Mill and pave 20th St from 2nd Ave to the end of the Frontier Building-38 x 330-mill two inches, replace two inch wearing 22nd St from 1st Ave back to new pavement-number 24 x 100-Mill and pave 23rd St from 1st Ave to 2nd Ave-32×390 mill and pave 24th St turn around 48 x 5O-priority marked with steel pegs-one large gravel area 25th St from 1st Ave up to construction ends-30 x 170-Mill and pave 29th St entrance from pt Ave-26 x 40-Mill and pave 32nd St entrance from 1st Ave to the end of Go Mart-25 x120-Mill and pave 35th St entrance on both sides (NOT THE CENTER)-to 2nd Ave- each section 10 x 200-Mill and pave 36th St entrance from 1st Ave-24 x 28-Mill and pave 38th St to 39th St on 2nd Ave, one large section 25 x 35 38th St entrance from 2nd Ave, 12 x 24 mill & pave – tie into the section on 38 & 39th 39th St entrance from 1st Ave-26 x 80-Mill and pave 41st St entrance-from 1st Ave 10 x 32_Mill and pave 31st Street East, several sections marked them, starting with one through four Section one-number 90-12 x 40-Mill and pave Section two-15 x 170-Mill and pave Section three to house 100-13 x 250-Mill and pave Section four-12 x 230-Mill and pave Valentine circle finish curb back across their driveway ADDITIONAL INFO: To fill cracks with sealer is $1.00 per foot-from 40th St to 20th St This bid includes projected paving for the spring and fall of 2026 Bid will include labor, materials, and equipment, 2-inch asphalt unless otherwise noted, milling, and tie-ins Mill complete entire paving areas, not just the tie ends 2-inch full-depth milling on all areas Haul milled materials off-site Clear the area of loose debris and vegetation Apply tack to any areas with hills or sharp turns only Place and compact 2" of wearing 1" asphalt in prepared areas The streets have been dotted with paint to show the beginning & end of each section Each street will show total cost – we will do half this spring and half in the fall unless Council decides we can do all at one time.
Posted Date
Mar 28, 2026
Due Date
Apr 16, 2026
Release: Mar 28, 2026
City of Nitro
Close: Apr 16, 2026
One section on county road 10 x 250-Starts halfway down county road-Mill & pave One section on Michigan Ave South, above St Albans bridge, where the drain was replaced. 12 x 30, two inches of base (It's marked), then apply two inches of topcoat on the total existing length of 12 x 110 (It's marked) One section on Dupont south above the St. Albans bridge, 16 x30 two-inch base (It's marked), then two-inch topcoat the entire length of 16 x 110-(it's marked) Kanawha Ave at the end of Kapok St, that has never been paved-14 x 240-three inches of base (priority) Ivy St from Main Ave to Dupont Ave- 14 x 238-Mill and pave 15th east on 3rd Ave – pave 15th St to 17th St 15 x 360-Mill & pave Top of Short St, one large section (priority)13 x 310-Mill and pave 9th St entrance from 1st Ave 16 x 20 and from house number 921 to the top of the bank and flare out-26 x 180 (PRIORITY)-Mill and pave 12th St entrance 32 x 24-Mill and pave 12th St from house number 1223 to 1232 – 26 x 193-mill two inches and replace two inches (PRIORITY) 15th St from 2nd Ave 26 x36-mill two inches replace two inches -house number 1505 -27 x 160 to house number 1505-excavate or mill 10 inches full depth area and install 6 inches of stone-replace with 2.05 base and 1.5 top (PRIORITY) 16th St at top, starting at house number 1635 at the end of the garage, and flare out to the wall on 3rd Ave-16 x 5O – Mill and pave 19th St at crossing end at 2nd Ave one large section – 10 x 32 – Mill and pave 20th St from 2nd Ave to the end of the Frontier Building-38 x 330-mill two inches, replace two inch wearing 22nd St from 1st Ave back to new pavement-number 24 x 100-Mill and pave 23rd St from 1st Ave to 2nd Ave-32×390 mill and pave 24th St turn around 48 x 5O-priority marked with steel pegs-one large gravel area 25th St from 1st Ave up to construction ends-30 x 170-Mill and pave 29th St entrance from pt Ave-26 x 40-Mill and pave 32nd St entrance from 1st Ave to the end of Go Mart-25 x120-Mill and pave 35th St entrance on both sides (NOT THE CENTER)-to 2nd Ave- each section 10 x 200-Mill and pave 36th St entrance from 1st Ave-24 x 28-Mill and pave 38th St to 39th St on 2nd Ave, one large section 25 x 35 38th St entrance from 2nd Ave, 12 x 24 mill & pave – tie into the section on 38 & 39th 39th St entrance from 1st Ave-26 x 80-Mill and pave 41st St entrance-from 1st Ave 10 x 32_Mill and pave 31st Street East, several sections marked them, starting with one through four Section one-number 90-12 x 40-Mill and pave Section two-15 x 170-Mill and pave Section three to house 100-13 x 250-Mill and pave Section four-12 x 230-Mill and pave Valentine circle finish curb back across their driveway ADDITIONAL INFO: To fill cracks with sealer is $1.00 per foot-from 40th St to 20th St This bid includes projected paving for the spring and fall of 2026 Bid will include labor, materials, and equipment, 2-inch asphalt unless otherwise noted, milling, and tie-ins Mill complete entire paving areas, not just the tie ends 2-inch full-depth milling on all areas Haul milled materials off-site Clear the area of loose debris and vegetation Apply tack to any areas with hills or sharp turns only Place and compact 2" of wearing 1" asphalt in prepared areas The streets have been dotted with paint to show the beginning & end of each section Each street will show total cost – we will do half this spring and half in the fall unless Council decides we can do all at one time.
City of Nitro
The City of Nitro, West Virginia requests sealed bids for exterior repairs and improvements to the Nitro Police Department. The scope includes masonry repair, window flashing, awning replacement, new metal roofing, gutters, stair construction, and full exterior painting. Bids must be submitted by Friday, March 6 2026 at 3:00 pm via mail, hand‑delivery, or email.
Posted Date
Feb 21, 2026
Due Date
Mar 6, 2026
Release: Feb 21, 2026
City of Nitro
Close: Mar 6, 2026
The City of Nitro, West Virginia requests sealed bids for exterior repairs and improvements to the Nitro Police Department. The scope includes masonry repair, window flashing, awning replacement, new metal roofing, gutters, stair construction, and full exterior painting. Bids must be submitted by Friday, March 6 2026 at 3:00 pm via mail, hand‑delivery, or email.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: Use the city’s existing cooperative purchasing membership to buy now (start with Sourcewell).
Entity: City of Nitro, WV
Policy posture: No formal sole source policy on record; Council has accepted awards based on a “single bid received.”
Board meetings and strategic plans from City of Nitro
The board reviewed and approved the previous month's meeting minutes and financials. Discussion included the upcoming 2020 Kanawha and Putnam Delinquent Tax Sale, with a unanimous vote to authorize the purchase of properties deemed important for the landbank, up to \$25,000. Plans for newly acquired properties at 39th St and 24th/25th Streets were discussed, including asbestos testing, abatement, demolition, and tenant eviction notices. The board also discussed the purchase of a new property and associated costs during an executive session.
The board received an update on infrastructure work at 2401 1st Ave lots, noting delays due to unforeseen old water lines. A third draw of $10,000 was approved for Dana Casto Construction on this project. The board also voted to hire an attorney to assist with the eviction of a tenant at 3102 31st St in Putnam County.
The board discussed the use of REAP funds for sewer line relocation, reviewed the progress of the WVDEP REAP Demolition Program, and amended the sale process for residential vacant lots. An offer was made on a vacant property during an executive session, and several properties were listed for public sale.
The board added 613 1st Ave S to the demolition list for phase I of the WVDEP REAP program and instructed the director to begin the necessary paperwork. The first phase of the demolition project, including a press conference, is scheduled to begin on November 15. The board voted not to renew the contract with Property Elite and will reevaluate in the future. The board also discussed and decided to proceed with the purchase of a property from the State Auditor's Land Sale.
The board received an update on infrastructure work at 2401 1st Ave lots, including the completion of upgrades by WV American Water and Mountaineer Gas, and the approval of a drawdown request for sewer line relocation. An amendment to the bylaws to change the fiscal year to July-June was approved, along with the appointment of board members for 4-year terms. Finally, the board approved the option to purchase a property, with the specifics determined in executive session.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Nitro's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database