Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Morro Bay
The City of Morro Bay is soliciting Statements of Qualifications to examine, replace, install, and maintain its public safety radio system and infrastructure to improve connectivity and encryption capabilities. Work includes design and construction at three specified Morro Bay sites with a period of performance expected from June 2026 to August 2026. Interested consultants must submit three hard copies and one electronic copy of their qualifications by the May 2026 deadline.
Posted Date
Apr 8, 2026
Due Date
May 8, 2026
Release: Apr 8, 2026
City of Morro Bay
Close: May 8, 2026
The City of Morro Bay is soliciting Statements of Qualifications to examine, replace, install, and maintain its public safety radio system and infrastructure to improve connectivity and encryption capabilities. Work includes design and construction at three specified Morro Bay sites with a period of performance expected from June 2026 to August 2026. Interested consultants must submit three hard copies and one electronic copy of their qualifications by the May 2026 deadline.
AvailableCity of Morro Bay
The work shall include, but is not limited to grading and construction of an ada concrete paved parking stall and, concrete pedestrian walk ways, flatwork, and sidewalks, installation of water and sewer services, surface/subsurface drainage appurtenances, preparation of pad foundation for installation of a new prefabricated restroom building to be installed by the restroom manufacturer, installation of a play equipment area and surfacing, concrete seat walls, and related ada improvements and associated improvements.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
City of Morro Bay
Close: Feb 17, 2026
The work shall include, but is not limited to grading and construction of an ada concrete paved parking stall and, concrete pedestrian walk ways, flatwork, and sidewalks, installation of water and sewer services, surface/subsurface drainage appurtenances, preparation of pad foundation for installation of a new prefabricated restroom building to be installed by the restroom manufacturer, installation of a play equipment area and surfacing, concrete seat walls, and related ada improvements and associated improvements.
City of Morro Bay
The City of Morro Bay is soliciting proposals for professional design and engineering services for the Elena-Blanca Pressure Zone Consolidation project, including design and engineering services during construction. The project will consolidate pressure zones (Blanca, Elena and related zones) to improve water system efficiency and reduce booster station needs. Proposers are asked to submit qualifications and proposals per the City’s RFP instructions available on the City bidding portal.
Posted Date
-
Due Date
Jan 30, 2026
City of Morro Bay
Close: Jan 30, 2026
The City of Morro Bay is soliciting proposals for professional design and engineering services for the Elena-Blanca Pressure Zone Consolidation project, including design and engineering services during construction. The project will consolidate pressure zones (Blanca, Elena and related zones) to improve water system efficiency and reduce booster station needs. Proposers are asked to submit qualifications and proposals per the City’s RFP instructions available on the City bidding portal.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Only pursue if you’re a unique professional service essential to a specific complex project; otherwise stick with Sourcewell/direct quotes.
Coops: If your product is on Sourcewell, use the city’s membership to purchase; for amounts over $125,000, this is the fastest path. Under $125,000: Run a direct quote-based path in parallel (simple vendor registration and quick quotes).
Entity: City of Morro Bay, CA.
Threshold/use: Sole source above $125,000 is rare and reserved for highly specialized services with unique prior experience.
Board meetings and strategic plans from City of Morro Bay
The FY 2025-26 budget includes total revenues of $48.3 million, excluding transfers, and $63.7 million, including transfers. The total citywide expenditure budget is $53.4 million, excluding transfers, and $68.9 million, including transfers. It funds operational departments providing core services such as police, fire, water, sewer, parks, roads, recreation, community development, code enforcement, and harbor programs, as well as administrative services like human resources, IT, and finance. The budget also addresses strategic planning goals related to economic vitality, fiscal health, infrastructure resiliency, and the Morro Elementary School site. Efforts to control operational expenditures and boost revenues include cost containment, renegotiating contracts, updating revenue sources, proper cost allocation, project prioritization, and exploring a hiring slowdown.
The City Council adopted Resolution No. 43-25, which accepts the calculation of the FY 2025-26 appropriations limit, as prepared by the Morro Bay Finance Department, and establishes the FY 2025-26 appropriations limit at $37,744,894, based on the calculation detailed in Exhibits 1 and 2 attached hereto.
The City Council of the City of Morro Bay convened to address financial management and investment policies. Key actions included rescinding Resolution No. 50-24, which designated investment transaction officers, and establishing an internal control policy for investment transactions. The council approved a new "Investment Policy" as set forth in Exhibit A, designating specific city officials authorized to manage investment accounts. The resolution emphasizes internal controls, requiring written approval for investment-related transactions, and prioritizes socially responsible investing. This ensures effective, safe, and optimized management of the City's funds.
The Morro Bay City Council meeting included presentations for National Adoption Month and National Apprenticeship Week proclamations. The council discussed the creation of a Utility Division Supervisor classification, year-end budget amendments, and a contract with San Luis Obispo County for animal care and control services. They also considered amendments to a contract for the Kings Tanks and Blanca Tanks Rehabilitation Project and reviewed the First Quarter Investment Report for Fiscal Year 2022-23. Additionally, the council addressed the continued state of emergency due to COVID-19 and amendments to the Morro Bay Municipal Code, including the adoption of a Zoning Code/Coastal Implementation Plan and the 2022 California Building Standards Code. They also discussed awarding Fiscal Year 2022-23 Community Grants and an amendment to the CalPERS contract for local fire members.
This document outlines the scope and content for the Environmental Impact Report (EIR) for the Morro Bay General Plan and Local Coastal Program Update, referred to as 'Plan Morro Bay'. Plan Morro Bay is a comprehensive strategy for the city's development and conservation through 2040, aiming to maintain its character as a thriving oceanfront town. Key strategic pillars include a 'Blueprint' for development decisions, covering land use, community design, economic development, circulation, noise, community well-being, and housing, and a 'Greenprint' for resource management, focusing on conservation, open space, and public safety. The overall vision is to preserve natural beauty, support a working waterfront, and foster a welcoming community while adapting to future challenges.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Morro Bay's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Interim Assistant City Manager/Admin Services Director
Premium
Access the largest public sector contact database