Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Medora
The work includes the following approximate principal quantities: sanitary sewer lift station, 11 sanitary manholes, approx 2,500 LF of gravity sanitary sewer, approx 3,650 LF of sanitary sewer force main, approxy 1,150 LF of directionally drilled sanitary sewer force main, approx 1,670 LF of water main, and approximately 1,150 LF of bored water main.
Posted Date
Feb 13, 2026
Due Date
Mar 6, 2026
Release: Feb 13, 2026
City of Medora
Close: Mar 6, 2026
The work includes the following approximate principal quantities: sanitary sewer lift station, 11 sanitary manholes, approx 2,500 LF of gravity sanitary sewer, approx 3,650 LF of sanitary sewer force main, approxy 1,150 LF of directionally drilled sanitary sewer force main, approx 1,670 LF of water main, and approximately 1,150 LF of bored water main.
AvailableCity of Medora
Project consists of reconstruction and expansion of lagoon cell #4. 756 LF remove existing fence; 1497 CY strip and replace topsoil; 39359 CY common excavation - type A; 5243 CY common excavation - waste; 2 AC seeding - class II; 2 AC straw mulch; 2273 LF silt fence; 2273 removal silt fence; 553 TN; aggregate base course cl 13; 2 EA concrete discharge structure; 1 LS mobilization; 2 EA lagoon cell depth indicator; 117 LF 8" sanitary sewer pipe; 2 EA 8' eccentric plug valve; 6" sanitary sewer pipe; 756 LF fence barbed wire 4 strand - steel post; 3 EA corner assembly barbed wire; 19236 SY geo-liner; 398 CY subgrade preparation - type C - 12"; 320 TN bentonite material; 4275 CY subgrade preparation and bentonite AMI; 4275 CY common excavation - type A. See attached file.
Posted Date
Feb 6, 2026
Due Date
Mar 5, 2026
Release: Feb 6, 2026
City of Medora
Close: Mar 5, 2026
Project consists of reconstruction and expansion of lagoon cell #4. 756 LF remove existing fence; 1497 CY strip and replace topsoil; 39359 CY common excavation - type A; 5243 CY common excavation - waste; 2 AC seeding - class II; 2 AC straw mulch; 2273 LF silt fence; 2273 removal silt fence; 553 TN; aggregate base course cl 13; 2 EA concrete discharge structure; 1 LS mobilization; 2 EA lagoon cell depth indicator; 117 LF 8" sanitary sewer pipe; 2 EA 8' eccentric plug valve; 6" sanitary sewer pipe; 756 LF fence barbed wire 4 strand - steel post; 3 EA corner assembly barbed wire; 19236 SY geo-liner; 398 CY subgrade preparation - type C - 12"; 320 TN bentonite material; 4275 CY subgrade preparation and bentonite AMI; 4275 CY common excavation - type A. See attached file.
AvailableCity of Medora
Project includes aprpox 60 EA of 2,077 CY of excavation; 8" pipe PVC forcemain; 32 LF of 12" pipe PVC sewer. 1 LS mobilization; 1 LS removal of structures and obstructions; 4,500 SF seeding class II; 225 TN aggregate base course cl5 - surfacing; 32 LF pipe PVC 12" sewer; 60 LF pipe PVC 8" forcemain; 4 EA fitting 8" MJ 45 deg; 1 LS connection to existing forcemain; 1 LS connection to existing manhole; 1 LS electrical and controls building; 1 LS install sanitary sewage lift station; 1 LS move existing generator and automatic transfer switch; 1 LS propane tank connection to generator; 1 LS extend and rehab existing manhole; 2,077 CY excavation and embankment; 130 CY topsoil - removal and replacement; 1 EA davit crane with electrical winch (2,800 lb capacity). See attached file.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
City of Medora
Close: Jan 29, 2026
Project includes aprpox 60 EA of 2,077 CY of excavation; 8" pipe PVC forcemain; 32 LF of 12" pipe PVC sewer. 1 LS mobilization; 1 LS removal of structures and obstructions; 4,500 SF seeding class II; 225 TN aggregate base course cl5 - surfacing; 32 LF pipe PVC 12" sewer; 60 LF pipe PVC 8" forcemain; 4 EA fitting 8" MJ 45 deg; 1 LS connection to existing forcemain; 1 LS connection to existing manhole; 1 LS electrical and controls building; 1 LS install sanitary sewage lift station; 1 LS move existing generator and automatic transfer switch; 1 LS propane tank connection to generator; 1 LS extend and rehab existing manhole; 2,077 CY excavation and embankment; 130 CY topsoil - removal and replacement; 1 EA davit crane with electrical winch (2,800 lb capacity). See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Medora
The Medora Planning and Zoning Commission convened to discuss several proposals, including the replacement of a shed by the North Dakota Cowboy Hall of Fame and updates to show signage and a sandwich board by TRMF. The commission also discussed revisions to City Ordinances, Chapter 6-Zoning, and reviewed the City Code of Ethics, particularly focusing on potential conflicts of interest for voting members.
The Medora Planning and Zoning Commission convened to discuss several new business items. Approvals were granted for applications concerning awning and glass installations, decal lettering, door painting, construction of a concession stand, a utility pole lease, demolition of a greenhouse, fence installation, relocation of conservation shelters, siding replacement, signage updates, and shadowbox installation. Additionally, there was a discussion regarding hours signage, and it was determined that it does not require zoning approval. The meeting concluded with announcements about the zoning application deadline and the next zoning meeting date.
The meeting included the annual election of the Commission President. The zoning board discussed the ridgeline ordinance and voted on multiple applications related to building additions, signage, and retail space. An update was presented on the Western Heritage Arena project, and Amy McCann provided an update on the Theodore Roosevelt Presidential Library, offering tours to city residents and zoning board members.
The Medora Planning and Zoning Commission convened to discuss several proposals. Approvals were granted for a retail space for Point-to-Point Park, with recommendations from the City Engineer, and for construction trailers, deemed part of a previously approved construction plan. An application for signage was tabled until the next meeting at the applicant's request. Additionally, entrance modifications were approved, as well as parking canopies and an overlook boardwalk. The meeting concluded with announcements regarding the deadline for zoning applications and the date of the next zoning meeting.
The meeting included department reports from the City Engineer, City Attorney, Ambulance, Police, Public Works, MCC, and City Auditor. Key discussion points included the Lead Service Line Inventory, the AC Main Replacement project, the Sanitary Sewer Lift Station Rehabilitation, and the Western Heritage Arena. The council approved the BMS pay online payment system, promoted Ivy Maus to Deputy Auditor, approved pledge reports from First State Bank and Bank of the West, and amended the MACVB budget. The 2019 audit was reviewed and approved. A permit for carriage rides was approved, and updates were given on the city webpage and the Theodore Roosevelt Presidential Library Foundation. Civil Science presented an overview of Pacific Ave roadway improvements. A permit application from Friends of the Chateau was approved. Discussions were held regarding changes to the water and sewer billing structure, specifically addressing charges for churches and adjusting wastewater rates. Finally, financial statements and payroll were reviewed and approved.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Medora's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Medora's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database