Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of La Pine
Consulting services to lead a housing code amendment work program, including the preparation of hearings-ready recommendations for comprehensive plan and development code amendments.
Posted Date
Feb 26, 2026
Due Date
Apr 1, 2026
Release: Feb 26, 2026
City of La Pine
Close: Apr 1, 2026
Consulting services to lead a housing code amendment work program, including the preparation of hearings-ready recommendations for comprehensive plan and development code amendments.
AvailableCity of La Pine
The Project includes the following Work: Demolition of an existing wastewater lift station; construction of a new duplex submersible wastewater lift station; installation of approx. 85 LF of 12" polyvinyl chloride (PVC) gravity sewer pipe; installation of approx. 5,689 LF of 10" PVC pressure sewer line, including a pipeline crossing of U.S. Highway 97; installation of approx. 650 LF of 8" PVC pressure sewer line; installation of electrical, controls, and instrumentation; installation of a new standby power generator system; site and restoration work; and painting, together with all other Work.
Posted Date
Mar 13, 2025
Due Date
Apr 10, 2025
Release: Mar 13, 2025
City of La Pine
Close: Apr 10, 2025
The Project includes the following Work: Demolition of an existing wastewater lift station; construction of a new duplex submersible wastewater lift station; installation of approx. 85 LF of 12" polyvinyl chloride (PVC) gravity sewer pipe; installation of approx. 5,689 LF of 10" PVC pressure sewer line, including a pipeline crossing of U.S. Highway 97; installation of approx. 650 LF of 8" PVC pressure sewer line; installation of electrical, controls, and instrumentation; installation of a new standby power generator system; site and restoration work; and painting, together with all other Work.
City of La Pine
Design/build contractors (DBC) for the construction of a new pre-engineered metal building. The proposal is to include: all associated accessories including but not limited to flashing, trim and closures; doors and frames including hardware; framed openings designed to accept specified windows; cabinetry, finishes; gutters and downspouts; installation of electrical service, lighting, telecommunications, water, gas and sewer service as indicated in the proposal documents; installation of plumbing fixtures, domestic water distribution piping and water heating systems; installation of gas heating equipment, fans ductwork and diffusers/grills and cooling systems as an alternate and controls for HVAC equipment; site work including clearing, grading, paving and installation of utilities.
Posted Date
Feb 11, 2025
Due Date
Mar 14, 2025
Release: Feb 11, 2025
City of La Pine
Close: Mar 14, 2025
Design/build contractors (DBC) for the construction of a new pre-engineered metal building. The proposal is to include: all associated accessories including but not limited to flashing, trim and closures; doors and frames including hardware; framed openings designed to accept specified windows; cabinetry, finishes; gutters and downspouts; installation of electrical service, lighting, telecommunications, water, gas and sewer service as indicated in the proposal documents; installation of plumbing fixtures, domestic water distribution piping and water heating systems; installation of gas heating equipment, fans ductwork and diffusers/grills and cooling systems as an alternate and controls for HVAC equipment; site work including clearing, grading, paving and installation of utilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; pivot straight to a cooperative contract as the pre-competed, faster path.
Coops: If they’re open to coops, mention ORCPP, NASPO ValuePoint, Sourcewell, or OMNIA Partners.
City of La Pine, OR: No evidence of sole source awards or thresholds.
Track City of La Pine's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of La Pine's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database