RFP 2026-07 Irene B. Thomas Park Inclusive Playground Renovation
Posted
Aug 27, 2026
Sep 25, 2026
The City of Hinesville is seeking a qualified contractor for a turnkey design-build renovation of the Irene B. Thomas Park playground into an inclusive, accessible play environment for children ages 2–12 and caregivers of varied abilities. The work includes demolition, site preparation, inclusive equipment, integrated shade, accessible safety surfacing, permitting, inspections, warranties, and closeout, under a firm-fixed-price contract capped at $350,000. A mandatory pre-proposal conference and site visit is scheduled for September 15, 2026, and sealed proposals are due September 25, 2026 at 2:00 p.m. local time.
