Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Hendersonville
Work includes erosion and sediment control; site preparation and earthwork: construction staking, clearing, demolition, pond and weir, and mass grading; storm drainage: rcp pipes, structures, and roof drain connections; sanitary sewer - option #1 (gravity) all pvc gravity sewer lines, rcp culvert crossings, and oil/water separators; sanitary sewer- option #2 (force main connection): full connection to force main sewer, including all required sumps, pumps, and specialized assemblies. Pricing includes coordination with the city; water distribution option #1 (16") 16" main connection and associated lines/valves; water distribution option #2 (6") 6" northern connection, including all lines, meter assemblies, and associated valves/fittings. See attached file.
Posted Date
Mar 30, 2026
Due Date
Apr 20, 2026
Release: Mar 30, 2026
City of Hendersonville
Close: Apr 20, 2026
Work includes erosion and sediment control; site preparation and earthwork: construction staking, clearing, demolition, pond and weir, and mass grading; storm drainage: rcp pipes, structures, and roof drain connections; sanitary sewer - option #1 (gravity) all pvc gravity sewer lines, rcp culvert crossings, and oil/water separators; sanitary sewer- option #2 (force main connection): full connection to force main sewer, including all required sumps, pumps, and specialized assemblies. Pricing includes coordination with the city; water distribution option #1 (16") 16" main connection and associated lines/valves; water distribution option #2 (6") 6" northern connection, including all lines, meter assemblies, and associated valves/fittings. See attached file.
AvailableCity of Hendersonville
Scope of work includes - 16,500 SF vegetation removal (clearing + grubbing with hand tools only); 15,600 SF vegetation removal (clearing + grubbing with machinery allowed); 3 EA stump removal grinding (grinding stump 6" below grade); 11 EA tree removal; 7,000 SF hardscape removal; 1 EA existing sign removal and returned to Owner; 7,600 SF gravel removal; see attached file.
Posted Date
Mar 23, 2026
Due Date
Apr 23, 2026
Release: Mar 23, 2026
City of Hendersonville
Close: Apr 23, 2026
Scope of work includes - 16,500 SF vegetation removal (clearing + grubbing with hand tools only); 15,600 SF vegetation removal (clearing + grubbing with machinery allowed); 3 EA stump removal grinding (grinding stump 6" below grade); 11 EA tree removal; 7,000 SF hardscape removal; 1 EA existing sign removal and returned to Owner; 7,600 SF gravel removal; see attached file.
AvailableCity of Hendersonville
Remove existing 4-ton and 3-ton units; Furnish and install one (1) new 5-ton split gas-AC system and one (1) new 4-ton split gas-AC system. Each system shall include an 80% AFUE gas furnace, outdoor condenser, and high-efficiency evaporator coil. Install one (1) 24,000 BTU and one (1) 18,000 BTU Mitsubishi WX-series supplemental ductless units or approved equal. Contractor is responsible for all necessary electrical wire pulls from the main panel, installation of condenser mounting pads, and the application of professional-grade "Line Hide" covers for all exterior wall penetrations.
Posted Date
Mar 9, 2026
Due Date
Mar 23, 2026
Release: Mar 9, 2026
City of Hendersonville
Close: Mar 23, 2026
Remove existing 4-ton and 3-ton units; Furnish and install one (1) new 5-ton split gas-AC system and one (1) new 4-ton split gas-AC system. Each system shall include an 80% AFUE gas furnace, outdoor condenser, and high-efficiency evaporator coil. Install one (1) 24,000 BTU and one (1) 18,000 BTU Mitsubishi WX-series supplemental ductless units or approved equal. Contractor is responsible for all necessary electrical wire pulls from the main panel, installation of condenser mounting pads, and the application of professional-grade "Line Hide" covers for all exterior wall penetrations.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; the city prefers competitive/cooperative paths.
Coops: Use the city’s Sourcewell membership to buy directly and avoid a formal local bid.
City of Hendersonville shows no documented sole source awards and prefers competitive processes.
Board meetings and strategic plans from City of Hendersonville
The committee meeting covered several financial and administrative items. Key topics included the reading and discussion of an ordinance to amend the 2026 fiscal year budget, specifically regarding revenue projections, Parks department adjustments, storm-related debris cleanup, and various capital projects. The committee also reviewed the City's Annual Comprehensive Financial Report, a letter from the County concerning adequate facilities tax, and various departmental reports, including sales tax analysis, hotel-motel tax, investment earnings, and fund reports for Stormwater and Public Safety, Infrastructure, Parks and Paving.
The meeting covered several key initiatives, including the potential implementation of a history wall featuring digital frames to display photographs and stories. Discussions regarding the upcoming arts festival focused on vendor application progress, sponsorship goals, layout improvements, and entertainment planning. The council also explored options for a sculpture project, noting cost constraints and the need to research materials, potential grants, and bidding processes. Finally, plans were noted to discuss film festival logistics with an experienced organizer.
The committee meeting addressed several key agenda items, including resolutions for an inline hockey supply vending machine in Volunteer Park and the renaming of a road intersection to resolve public confusion. The committee reviewed updates on trash collection operations, storm debris removal, facilities assessments, and traffic calming policies. Additionally, they discussed potential improvements for the Innsbrooke and Saundersville Road intersection, the Sanders Ferry boardwalk railing installation, and the Drakes Creek and Stop 30 intersection project. The committee also covered the Light Synchronization Project, provided guidance on state-maintained route maintenance, and reviewed a tunnel project funding application.
The commission reviewed financial results for the golf course, covering both January performance and the fiscal year-to-date analysis. Updates were provided regarding repairs following a recent snow and ice storm, the schedule for green aerification, and the ongoing efforts to evaluate golf cart replacement costs. Discussions concluded with plans for a future special meeting to finalize a request for city financing for new golf carts.
The committee discussed several items regarding deer management, including the upcoming distribution of a bow hunter survey and increasing the frequency of public communications. Discussion also covered criteria for article postings and pre-planning for a future deer workshop, with considerations for expanded participation. An update was provided on deer-related accidents and carcass removals reported by the police officer.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Hendersonville's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database