ECWAG Water Improvements RFP
Posted
Aug 28, 2026
Oct 7, 2026
Reservoir site power improvements backup power for existing controls at the reservoir site including a universal power supply. Water treatment plant (wtp) bank stabilization improvements contractor to design and install slope stabilization for approx., 1,900 SF approaching the gates water treatment plant. Contractor to remove hazard trees. Thistledown booster pump station pump replacement - removal of existing 30 hp booster pump and propane engine. Installation of new 50kw propane generator and electric booster pump. Miscellaneous electrical and controls updates.