Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Easthampton
The City of Easthampton is soliciting proposals for a SCADA system for its water treatment facility. Interested vendors are directed to obtain full specifications by contacting the procurement officer via email as the document is not hosted on the aggregator site. The solicitation was posted on March 18, 2026, and remains open for bids until April 20, 2026.
Posted Date
Mar 18, 2026
Due Date
Apr 20, 2026
Release: Mar 18, 2026
City of Easthampton
Close: Apr 20, 2026
The City of Easthampton is soliciting proposals for a SCADA system for its water treatment facility. Interested vendors are directed to obtain full specifications by contacting the procurement officer via email as the document is not hosted on the aggregator site. The solicitation was posted on March 18, 2026, and remains open for bids until April 20, 2026.
AvailableCity of Easthampton
Shoreline stabilization - installation of a temporary coffer dam and dewatering, removal of deteriorated timber slope checks and restoration of the shoreline embankment with a tiered stone wall system.
Posted Date
Mar 10, 2026
Due Date
Mar 30, 2026
Release: Mar 10, 2026
City of Easthampton
Close: Mar 30, 2026
Shoreline stabilization - installation of a temporary coffer dam and dewatering, removal of deteriorated timber slope checks and restoration of the shoreline embankment with a tiered stone wall system.
AvailableEasthampton Retirement Board
Provide legal services.
Posted Date
Oct 27, 2025
Due Date
Nov 17, 2025
Release: Oct 27, 2025
Easthampton Retirement Board
Close: Nov 17, 2025
Provide legal services.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $50,000, use sole source.
Coops: Lead with cooperative purchasing; confirm your offering is available via an eligible coop and proceed.
City of Easthampton (MA) strongly favors competition for awards over $50,000. Sole source above this threshold is highly unlikely to be approved—deprioritize this path.
Board meetings and strategic plans from City of Easthampton
This Infrastructure Master Plan for the City of Easthampton's New City Neighborhood outlines physical improvements for aged and inadequate infrastructure, streetscapes, and community facilities. Key strategic pillars include upgrading sewer line capacity, enhancing multi-modal access and connectivity, addressing slope stability and drainage issues on Emerald Place, and developing an integrated neighborhood parks complex. The plan aims to revitalize the neighborhood by providing an enhanced infrastructural backbone, shared spaces, and improved physical amenities to foster interaction among residents.
This Infrastructure Master Plan for the Easthampton New City Neighborhood provides a roadmap for multi-year improvements to public infrastructure. The plan is based on comprehensive assessments of existing conditions for pavements, sidewalks, drainage, water, and sewer systems, alongside feedback gathered from residents. It proposes a hybrid green/gray infrastructure approach to manage drainage, outlines specific recommendations for replacing aging water mains and upgrading sewer systems to address capacity and problematic backyard lines, and details streetscape enhancements. The overall objective is to guide the phased implementation of improvements to enhance safety, connectivity, and environmental sustainability within the neighborhood.
The Property Committee meeting focused on the disposition of the town lodging house referral, specifically reviewing the draft Request for Proposal (RFP) and its criteria. Key discussion points included the minimum criteria for consideration, such as required forms, compliance with deed restrictions, statement of public benefit, references, and a detailed business plan with financial proformas. The comparative evaluation criteria were detailed, outlining rankings based on public benefit, renovation and reuse plans, financial feasibility, and timing of rehabilitation. Committee members debated whether to separate the elements within the 'public benefit' criterion (e.g., vulnerable communities, capital investment, neighborhood compatibility) for easier scoring, concluding that while they could be separated, the current structure encompassing several factors within 'public benefit' and 'financial feasibility' allows for qualitative judgment supported by staff expertise. The process for declaring the property surplus and the role of the Property Committee in developing the RFP in conjunction with staff were confirmed.
The joint meeting convened to discuss zoning recommendations developed by the Partnership and to gather feedback from the Rent Study Committee. Initial discussion focused on proposed language changes, including updating definitions to align with fair housing standards, making the definition of family more inclusive, and clarifying 'community character' with objective criteria. A specific change addressed lowering the multifamily parking minimum to align with standards for affordable multifamily housing. Remaining, more complex proposals still under review include land use considerations, mixed-use potential, and dimensional regulations. Key unresolved proposals include increasing flexibility for residential land use by permitting duplex construction by right and removing the 18-unit cap for multifamily structures, with presenters citing concerns over cost-effectiveness and eligibility for funding sources related to the current cap. The committee also discussed permitting small retail and service uses in residential zones subject to special permit approval to promote walkability, though concerns were raised regarding potential impacts on traffic, parking, and the aquifer protection overlay district. Members agreed to prioritize simpler changes, such as duplex by right, as potentially more palatable initial steps.
The joint meeting focused primarily on discussing the proposal for a groundwater modeling study, specifically utilizing the Modflow model, to assess the potential impacts of future zoning changes and development on the aquifer. Key discussion points included the study's methodology, which involves synthesizing existing data regarding subsurface materials and conducting a sensitivity analysis to determine necessary data completeness. The proposed study aims to function as a decision-making tool, potentially informing decisions related to wetland protection ordinances and housing construction grant applications. Attendees discussed the potential cost range of the study ($60,000 to $75,000, depending on optional scenario planning) and the importance of continuous engagement with modeling experts throughout the project. There was also mention that the scope of the study should extend beyond municipal lines to include adjacent areas like Southampton due to shared groundwater resources.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Easthampton's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database