Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $15,000, sole source is theoretically allowed but don’t pursue; pivot immediately to a cooperative path.
Coops: Lead with Sourcewell. Ask Purchasing to process as a cooperative purchase and confirm your offering is on a valid coop or state contract.
City of Chattahoochee Hills, GA: Policy allows sole source in theory, but there’s no evidence it’s used. Competitive bidding kicks in at a low $15,000 threshold, making sole source impractical here.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Chattahoochee Hills's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief of Police
Building Inspector
Economic Development Director
Community Development Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Chattahoochee Hills
Seeking for professional planning and technical services to prepare an fhwa-compliant transportation safety action plan under the federal highway administration s safe streets and roads for all (ss4a) program.
Posted Date
Jan 9, 2026
Due Date
Feb 26, 2026
Release: Jan 9, 2026
City of Chattahoochee Hills
Close: Feb 26, 2026
Seeking for professional planning and technical services to prepare an fhwa-compliant transportation safety action plan under the federal highway administration s safe streets and roads for all (ss4a) program.
AvailableCity of Chattahoochee Hills
Exterior Scope of Work: 1. Cleaning and Painting: Pressure wash and paint the entire exterior of the building, including all exterior doors. 2. Roofing Installation: Install lathing and 16-gauge metal roofing over the existing shingle roof system. 3. Roof Trim: Install all required metal rake, valley, and ridge trim to ensure a complete and weatherproof finish. 4. Column Repairs: Repair all damaged or deteriorated exterior columns and repaint to match existing finishes. 5. Gutters and Downspouts: Remove and replace all existing gutters and downspouts. 6. Fascia and Soffit: Inspect all fascia and soffit components and replace or repair as necessary. Interior Scope of Work: 1. Flooring Replacement: Demolish both layers of existing VCT tile and install new glue-down LVT flooring (Mohawk brand or approved equivalent). 2. Flooring Samples: Provide flooring product samples for Owner’s selection and approval. 3. Base Installation: Install new 4" vinyl base throughout (color to be selected by Owner). 4. Kitchen Renovation. See file for detailed scope.
Posted Date
Oct 6, 2025
Due Date
Nov 13, 2025
Release: Oct 6, 2025
City of Chattahoochee Hills
Close: Nov 13, 2025
Exterior Scope of Work: 1. Cleaning and Painting: Pressure wash and paint the entire exterior of the building, including all exterior doors. 2. Roofing Installation: Install lathing and 16-gauge metal roofing over the existing shingle roof system. 3. Roof Trim: Install all required metal rake, valley, and ridge trim to ensure a complete and weatherproof finish. 4. Column Repairs: Repair all damaged or deteriorated exterior columns and repaint to match existing finishes. 5. Gutters and Downspouts: Remove and replace all existing gutters and downspouts. 6. Fascia and Soffit: Inspect all fascia and soffit components and replace or repair as necessary. Interior Scope of Work: 1. Flooring Replacement: Demolish both layers of existing VCT tile and install new glue-down LVT flooring (Mohawk brand or approved equivalent). 2. Flooring Samples: Provide flooring product samples for Owner’s selection and approval. 3. Base Installation: Install new 4" vinyl base throughout (color to be selected by Owner). 4. Kitchen Renovation. See file for detailed scope.
City of Chattahoochee Hills
Develop the city’s 2026 Comprehensive Plan. See attached file.
Posted Date
Sep 23, 2025
Due Date
Oct 15, 2025
Release: Sep 23, 2025
City of Chattahoochee Hills
Close: Oct 15, 2025
Develop the city’s 2026 Comprehensive Plan. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.