Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Chandler
Work includes approx. install 1,450 (domestic 5/8" X 3/4" ) water meters; install 100 (Commercial 1" ) water meters; establish automated meter reading system with necessary equipment, software, and appurtenances.
Posted Date
Apr 9, 2026
Due Date
May 4, 2026
Release: Apr 9, 2026
City of Chandler
Close: May 4, 2026
Work includes approx. install 1,450 (domestic 5/8" X 3/4" ) water meters; install 100 (Commercial 1" ) water meters; establish automated meter reading system with necessary equipment, software, and appurtenances.
AvailableCity of Chandler
Construction of one (1) SBR, one (1) aerobic digester, two (2) blowers, and miscellaneous plant piping. Work includes mobilization 1 LS; clearing, grubbing, excavation 1 LS; solid slab sod 441 SY; erosion control 1 LS; electrical service and distribution 1 LS; demolition 1 LS; 6" ductile iron pipe 29 LF; 8" ductile iron pipe (trenching) 251 LF: 8" stainless steel pipe 117 LF; 8" wall pipe (FLG X MJ) 8 EA; 12" wall pipe (FLG X MJ) 2 EA; 12" x 8" tee 1 EA; 8" x 90 degree bend 1 EA; 12" x 90 degree bend 1 EA; 12" x 8" 90 degree reducing bend 1 EA; 8" check valve 4 EA; 8" plug valve 4 EA; 8" dismantling joint (RJ) 2 EA; 8" spool 4 EA; temperature & D.O. probe 1 EA. See attached file.
Posted Date
Aug 7, 2025
Due Date
Sep 10, 2025
Release: Aug 7, 2025
City of Chandler
Close: Sep 10, 2025
Construction of one (1) SBR, one (1) aerobic digester, two (2) blowers, and miscellaneous plant piping. Work includes mobilization 1 LS; clearing, grubbing, excavation 1 LS; solid slab sod 441 SY; erosion control 1 LS; electrical service and distribution 1 LS; demolition 1 LS; 6" ductile iron pipe 29 LF; 8" ductile iron pipe (trenching) 251 LF: 8" stainless steel pipe 117 LF; 8" wall pipe (FLG X MJ) 8 EA; 12" wall pipe (FLG X MJ) 2 EA; 12" x 8" tee 1 EA; 8" x 90 degree bend 1 EA; 12" x 90 degree bend 1 EA; 12" x 8" 90 degree reducing bend 1 EA; 8" check valve 4 EA; 8" plug valve 4 EA; 8" dismantling joint (RJ) 2 EA; 8" spool 4 EA; temperature & D.O. probe 1 EA. See attached file.
City of Chandler
Construction of park to include landscape, parking, sidewalk, signage, metal trellises, lighting and construction.
Posted Date
Jul 17, 2025
Due Date
Jul 31, 2025
Release: Jul 17, 2025
City of Chandler
Close: Jul 31, 2025
Construction of park to include landscape, parking, sidewalk, signage, metal trellises, lighting and construction.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: Coops aren’t typical—if they’re open, mention OMES statewide contracts, HGACBuy, Sourcewell, and TOPS.
Entity: City of Chandler, OK
Thresholds/limits: No evidence of sole source awards above $25,000; competitive bid threshold at $25,000; council approval level around $20,000.
Board meetings and strategic plans from City of Chandler
The meeting encompassed two sessions: the Chandler Municipal Authority and the Chandler City Council. During the Authority session, the council discussed financial claims and approved various invoices related to the Reed Park project and EML Park project, including pay applications for construction contractors. There was also discussion regarding a water treatment facility expansion, which was tabled, and a proposed agreement with the Iowa Tribe, also tabled. During the City Council session, a citizen raised concerns regarding heavy truck traffic causing damage to private property and signage near Second Street, requesting the installation of signage to prevent large trucks from turning onto that route.
The agenda for the regular meeting includes consideration and possible action on several items. Key discussion points involve approving Five Tool Management to apply for the Department of Interior Slip-On Tanker Unit Grant for the Chandler Fire Department, and action on the FY2026 Build Road Grant. The Board will also address the final acceptance of the Construct Perimeter Fencing Project, associated payments to Lohmann Fencing and LBR Inc., and an amendment from LBR Inc. Other items include updates on grants, project updates, and consideration for the Mowing Contract for 2026, Hangar Construction, and Land Lease.
The regular meeting addressed several items under the consent agenda, including the ratification of claims paid in November 2025 totaling $267,939.14, approval of financial reports, and approval of several invoices from Kimley-Horn and HCGC, LLC related to the Read Park Project, which are to be paid from the CMA Cap Fund. The authority also adopted Resolution 2025-10 establishing meeting dates for 2026. In new business, the authority considered and rejected a contract amendment with SRB Engineering concerning engineering services for the Water Treatment Plant Expansion Project, agreeing to no additional money at that time. Furthermore, a Financial Commitment Letter from the Iowa Tribe related to the Wastewater Treatment Plant Expansion Project was accepted. The Public Works Director presented a time capsule scheduled to be opened at the next meeting on January 13, 2026.
The meeting commenced with the approval of the consent agenda, which included the ratification of claims paid in November, financial reports, departmental reports, and the adoption of Resolution 2025-11 establishing meeting dates for 2026. The council also unanimously approved Ordinance 2025-04 to rezone the property at 115 W 3rd Street from R-2 to C-2, declaring it an emergency. Council then considered and approved the installation of "Truck Prohibited" signs at the intersections of 2nd and Manvel Avenue and 3rd and Manvel Avenue. Following this, the council entered into and exited executive session to discuss confidential litigation matters with legal counsel. No action was taken regarding the executive session discussions.
The meeting commenced with an invocation and the pledge of allegiance. Key agenda items involved the consent agenda, which included the approval of minutes from the November 18, 2025, meeting, ratification of claims paid in November, and approval of financial reports and invoices related to the Reed Park project from Kimley Horn and HCGC LLC. A significant discussion focused on Resolution 2025-10 regarding the establishment of 2026 meeting dates. The body also considered a contract amendment with SRB Engineering for the water treatment plant expansion project, amounting to $268,900. Council members expressed strong reservations regarding the justification for these additional fees, noting that the original scope of work for the project had not changed and that other professionals deemed the claim unwarranted. The consensus leaned toward rejecting the amendment while maintaining adherence to the original contractual agreement, although some consideration was given to potentially compensating for value engineering work performed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Chandler's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database