Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Arcola
Qualified contractors for the expansion and reroofing of the Center. The project consists of (1) construction of an approx. 800 SF post-frame building addition and (2) removal and replacement of the entire existing roof system with new 40-year steel roofing. The City intends to select a contractor with demonstrated experience in post-frame construction and steel roofing systems for municipal or similar facilities. Post-Frame Building Expansion: approx. 800 SF post-frame addition to the existing Center, including Site preparation and layout, Post-frame structural system, including posts, framing, and connections, Foundation elements appropriate for post-frame construction, Exterior wall materials compatible with the existing structure, Integration with the existing building, including weather-tight connections, Coordination of roof tie-in with the existing structure, Compliance with all applicable building codes and ordinances Final dimensions, orientation, and design details will be coordinated with the City prior to construction. B. Tear-Off and Reroofing The selected contractor shall remove and dispose of the existing roofing system on the entire Center and install a new steel roofing system with a minimum 40-year manufacturer warranty. Work shall include: Complete tear-off and proper disposal of existing roofing materials, Inspection of roof decking and structural elements; replacement of damaged components as needed (with City approval), Installation of new underlayment, Installation of new 40-year steel roofing panels, New ridge caps, trim, flashing, fasteners, and accessories, Weather-tight integration with the new post-frame addition.
Posted Date
Jan 28, 2026
Due Date
Feb 26, 2026
Release: Jan 28, 2026
City of Arcola
Close: Feb 26, 2026
Qualified contractors for the expansion and reroofing of the Center. The project consists of (1) construction of an approx. 800 SF post-frame building addition and (2) removal and replacement of the entire existing roof system with new 40-year steel roofing. The City intends to select a contractor with demonstrated experience in post-frame construction and steel roofing systems for municipal or similar facilities. Post-Frame Building Expansion: approx. 800 SF post-frame addition to the existing Center, including Site preparation and layout, Post-frame structural system, including posts, framing, and connections, Foundation elements appropriate for post-frame construction, Exterior wall materials compatible with the existing structure, Integration with the existing building, including weather-tight connections, Coordination of roof tie-in with the existing structure, Compliance with all applicable building codes and ordinances Final dimensions, orientation, and design details will be coordinated with the City prior to construction. B. Tear-Off and Reroofing The selected contractor shall remove and dispose of the existing roofing system on the entire Center and install a new steel roofing system with a minimum 40-year manufacturer warranty. Work shall include: Complete tear-off and proper disposal of existing roofing materials, Inspection of roof decking and structural elements; replacement of damaged components as needed (with City approval), Installation of new underlayment, Installation of new 40-year steel roofing panels, New ridge caps, trim, flashing, fasteners, and accessories, Weather-tight integration with the new post-frame addition.
AvailableCity of Arcola
Work includes approx 13,000 LF of service laterals, connect existing sewer main and all related appurtenances.
Posted Date
Jul 30, 2025
Due Date
Sep 3, 2025
Release: Jul 30, 2025
City of Arcola
Close: Sep 3, 2025
Work includes approx 13,000 LF of service laterals, connect existing sewer main and all related appurtenances.
City of Arcola
Construction of 16,740 Gallons of Furnish & Spread Bituminous Materials, HFRS-2, 3,170 Gallons Furnish & Spread MC-30, 540 Tons of Furnish & Spread Aggregate Materials, CA-15, 12,650 SY Pulverization, and 1,220 Ton Aggregate Base Repair.
Posted Date
Jun 12, 2025
Due Date
Jun 23, 2025
Release: Jun 12, 2025
City of Arcola
Close: Jun 23, 2025
Construction of 16,740 Gallons of Furnish & Spread Bituminous Materials, HFRS-2, 3,170 Gallons Furnish & Spread MC-30, 540 Tons of Furnish & Spread Aggregate Materials, CA-15, 12,650 SY Pulverization, and 1,220 Ton Aggregate Base Repair.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $20,000, sole source is legally permissible but practically unused—deprioritize and pivot to coops.
Coops: Lead with cooperative contracts (Sourcewell or BuyBoard) to purchase directly and avoid a formal bid.
City of Arcola: Sole source is legally permissible but practically unused. There are no documented sole source awards over $20,000, and any such award would require a two-thirds alderman vote.
Board meetings and strategic plans from City of Arcola
Key discussions during the meeting involved an update on the IDOT Route 45 Project, where it was reported that a consultant will review conflicts and IDOT plans to reimburse 80% for determining necessary water main relocations, with a project bid anticipated in the fall. The agency also approved two service invoices: one to the City of Arcola for $3,132.24 and another to the City of Tuscola for $5,298.78.
The meeting involved the approval of the agenda as presented and the financial statements dated January 8, 2025. Under new business, an update was provided on the IDOT Route 45 Project, noting that Chastain and Associates is evaluating the plan and scope, with IDOT scheduling the widening project for a July letting. The agency also approved two separate service invoices: one to the City of Arcola for $3,171.82 and one to the City of Tuscola for $5,852.62.
The meeting included the approval of the financial report dated March 31, 2025. Under new business, a projected end-of-year distribution calculation showing approximately $355,500 available for distribution was presented, with a note regarding potential future costs related to the IDOT Route 45 project. Invoices from the City of Arcola ($3,109.52) and the City of Tuscola ($5,750.77) were approved. An update was provided stating that a representative from Chastain and Associates will meet with the Cities to review findings and suggestions regarding the scope evaluation for the planned IDOT Route 45 project.
The meeting included an update on the IDOT Route 45 Project, where it was reported that the bid was pushed back to January. Further analysis of the water main using ground penetrating radar indicated the main is deeper than initially expected, potentially reducing the required relocation work. Additionally, the agency approved two invoices for services: one to the City of Arcola for $3,154.96 and another to the City of Tuscola for $6,312.17.
The meeting commenced with the Pledge of Allegiance. Public comment included an update on several grants (DECO Grant, RIPI, Downtown Grant, State Legislative Grant) related to sanitary sewer improvements and downtown development. The council acted upon recommendations from the TIF Advisory Committee, approving a 20% TIF Rebate and a Storefront Rebate for Jacey Legacy LLC regarding improvements at 106 N. Oak, which involved approving corresponding TIF Redevelopment Agreements (Ordinances No. 25-S-12 and No. 25-S-13). Furthermore, the Mayor was authorized to execute a $5,000 Settlement Agreement with Sebastian Rivera, and the resignation of Gabe Menser was accepted. Committee reports indicated discussions regarding the Rivera settlement, and proposed ordinances for sidewalk snow/ice removal downtown and for the Downtown Festival District.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Arcola's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Arcola's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database