Pecan Street Reconstruction Project RFP
Posted
Nov 8, 2026
Dec 15, 2026
This project primarily consists of roadway and drainage improvements. Roadway improvements include complete reconstruction of the existing paved roadway with the addition of concrete drop-curb along both sides and new concrete driveways and isolated sections of concrete sidewalk replacement. Drainage improvements consist of replacement of drainage culvert end treatments and addition of concrete ditch pavement and rip-rap rubble. Signing and pavement markings are also included with thermoplastic striping being placed on the final asphalt surface. This project also includes minor utility work consisting of valve and manhole adjustments.