Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Chestnut Ridge School District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Curriculum and Instruction
Superintendent
Business and Computer Information Technology Teacher
Board President
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Chestnut Ridge School District
Work includes construction of a new 62,000 SF, two-level elementary school addition to the existing middle school. The project includes all building construction and systems, fully integrated with the existing middle school, including but not limited to: foundations, structural systems, roofing, facade and building envelope components, HVAC, electrical, plumbing, life safety systems, and fire alarm systems. The scope of work also includes all revised and new site work, including but not limited to: site excavation; stockpiling of excess excavation materials and topsoil; erosion and sediment control measures; stormwater utilities; sanitary utilities; electrical utilities; installation of a new water line from an off-site connection; revised and new curbing; asphalt paving; concrete sidewalks, steps, and aprons; final landscaping; and playground areas, including surfaces, fencing, and gates.
Posted Date
Jan 9, 2026
Due Date
Jan 31, 2026
Release: Jan 9, 2026
Chestnut Ridge School District
Close: Jan 31, 2026
Work includes construction of a new 62,000 SF, two-level elementary school addition to the existing middle school. The project includes all building construction and systems, fully integrated with the existing middle school, including but not limited to: foundations, structural systems, roofing, facade and building envelope components, HVAC, electrical, plumbing, life safety systems, and fire alarm systems. The scope of work also includes all revised and new site work, including but not limited to: site excavation; stockpiling of excess excavation materials and topsoil; erosion and sediment control measures; stormwater utilities; sanitary utilities; electrical utilities; installation of a new water line from an off-site connection; revised and new curbing; asphalt paving; concrete sidewalks, steps, and aprons; final landscaping; and playground areas, including surfaces, fencing, and gates.
AvailableChestnut Ridge School District
Purchase of classroom furniture. Ten (10) ki torsion air stack sled base armless chairs. Sixty-nine (69) ki intellect wave trapezoid desks. Seventy-eight (78) ki ruckus chairs. Six (6) ki single post cantilever desks.
Posted Date
Jul 31, 2024
Due Date
Aug 12, 2024
Release: Jul 31, 2024
Chestnut Ridge School District
Close: Aug 12, 2024
Purchase of classroom furniture. Ten (10) ki torsion air stack sled base armless chairs. Sixty-nine (69) ki intellect wave trapezoid desks. Seventy-eight (78) ki ruckus chairs. Six (6) ki single post cantilever desks.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.