Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Centre de Services Scolaire du Chemin-du-Roy
The Centre de services scolaire du Chemin-du-Roy is soliciting bids for the replacement of the flat roof covering (Phase 5) at École secondaire Chavigny, located at 365 rue Chavigny, Trois-Rivières, Quebec. This is a public construction tender published on SEAO requiring qualified contractors to perform roofing work including replacement of 8 basins. Bids must be submitted electronically via SEAO by 2026-07-14 18:00 (Quebec time).
Posted Date
Jun 23, 2026
Due Date
Jul 14, 2026
Release: Jun 23, 2026
Centre de Services Scolaire du Chemin-du-Roy
Close: Jul 14, 2026
The Centre de services scolaire du Chemin-du-Roy is soliciting bids for the replacement of the flat roof covering (Phase 5) at École secondaire Chavigny, located at 365 rue Chavigny, Trois-Rivières, Quebec. This is a public construction tender published on SEAO requiring qualified contractors to perform roofing work including replacement of 8 basins. Bids must be submitted electronically via SEAO by 2026-07-14 18:00 (Quebec time).
AvailableCentre de Services Scolaire du Chemin-du-Roy
This notice solicits bids for the replacement of the flat roof covering (phase 1) at the Centre Sportif Promutuel Assurance (building 209) in Trois-Rivières, Quebec. The existing PVC membrane on the building's flat roof, installed since the building's original construction in 2007, has reached the end of its service life and several recent repair attempts have shown it can no longer be repaired, so it must be replaced. The project is managed by the Centre de services scolaire du Chemin-du-Roy and bids are due by 14:00 on July 13, 2026.
Posted Date
Jun 22, 2026
Due Date
Jul 13, 2026
Release: Jun 22, 2026
Centre de Services Scolaire du Chemin-du-Roy
Close: Jul 13, 2026
This notice solicits bids for the replacement of the flat roof covering (phase 1) at the Centre Sportif Promutuel Assurance (building 209) in Trois-Rivières, Quebec. The existing PVC membrane on the building's flat roof, installed since the building's original construction in 2007, has reached the end of its service life and several recent repair attempts have shown it can no longer be repaired, so it must be replaced. The project is managed by the Centre de services scolaire du Chemin-du-Roy and bids are due by 14:00 on July 13, 2026.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Centre de Services Scolaire du Chemin-du-Roy
This document defines an educational project as a roadmap for an establishment, outlining issues, orientations, and priorities to guide staff and students toward educational success. It is based on analyzing student needs and success-related issues. Key areas of focus include improving student academic results, fostering a positive school climate, ensuring student well-being, safety, and health, and implementing specific educational activities. The project must align with the school service center's commitment plan, with the council playing a crucial role in its adoption, follow-up, and public evaluation of results.
The meeting included discussions and decisions on various topics, such as the adoption of the agenda, administering oaths, and declarations of conflicts of interest. The board also discussed and adopted the minutes from the previous ordinary session on May 21, 2025. Additionally, the board addressed the write-off of receivables exceeding $25,000, revisions to the communication policy, and updates to the policy regarding the maintenance or closure of schools and modifications to educational services. The board also reviewed and adopted the triennial plan for the allocation and destination of buildings for 2025-2028, as well as establishment acts for 2025-2026. Furthermore, the meeting included follow-ups on the board's minutes, the filing of committee minutes, and declarations and commitments to ethical standards. Reports were presented by the board president and the general director, covering key issues, accountability, and educational project follow-ups. The board also discussed committee reports on governance, ethics, audit, and human resources. Policies on student admission and registration criteria, as well as transition rules between education levels, were addressed, along with the nomination of a complaints officer. Finally, the board discussed transport policies, tariffs, and concerns regarding hiring freezes, which were to be communicated to the Ministry of Education.
The strategic plan emphasizes the importance of concrete means to identify strengths and weaknesses, aligning with the overall vision of the school service center for the next four years. It prioritizes educational success, school climate, and the well-being of staff members. The plan aims to improve student outcomes, foster daily successes, and support the holistic development of each child, whether in sports, academics, or social activities. It also focuses on vocational training and adult education, ensuring that all staff members believe in and contribute to the educational projects, with a commitment to collaboration and the values of the people involved.
The meeting covered various topics including the adoption of the agenda, prestation of the oath, declaration of conflicts of interest, and a question period for attendees. It also involved the review and follow-up of previous meeting minutes and committee reports. Key discussions included ethical standards for council members, reports from the board president and general director, and updates on pilot projects such as staffing plans, human resources, and the PEVR 2023-2027. The council addressed grievances from teaching staff, staffing plans for support staff, resource allocation, risk management for corruption and collusion, transportation pricing, contract awards for cleaning services and air conditioning replacement, information security policies, renewal of the Sport-études program, and a triennial plan for building allocation.
The meeting addressed the renovation of the heating system at École Chavigny, accepting the lowest compliant bid from Groupe PRG inc. Additionally, the renovation of foundations and pedagogical spaces at École Louis-de-France was discussed, with the lowest compliant bid accepted from Reed Construction. The renewal of licenses with GRICS for the year 2019-2020 was authorized, with the amount adjusted based on the actual enrollment as of September 30, 2019.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Centre de Services Scolaire du Chemin-du-Roy's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge