ND OMAD 2025(1) Minuteman Missile Access (Request For Quotation) Fargo
Posted
Oct 1, 2026
Dec 2, 2026
Provide Minuteman Missile AccessMinuteman Missile Access. The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 27 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. See attached file.