Open RFP

ND OMAD 2025(1) Minuteman Missile Access (Request For Quotation) Fargo

Description: Provide Minuteman Missile AccessMinuteman Missile Access. The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 27 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. See attached file.

Released
Oct 1, 2026
Closes
Dec 2, 2026(24 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts