Gorman Rupp Pump Delivery and Install Contract No. 1
Posted
Sep 11, 2024
Apr 19, 2030
Work include pump "1" will be uninstalled, and the super-t series t4a3s-b will be installed in its place. The rotating assembly in pump "1" will be installed into the remaining classic t4a3-b pump "2". Install belts and gaskets as necessary. Provide new control panel and floats.