West Perimeter Bridge RFP
Posted
Sep 10, 2026
Oct 20, 2026
Demolition and removal of the existing bridge structure and associated site elements, installation of a new vehicle bridge, construction of ADA-compliant warning curbs as indicated on the contract drawings, removal and relocation/protection of existing water lines as required, and reconstruction of pavement and approach transitions on both sides of the bridge to achieve proposed grades.