Belgrade Water Controls Upgrade 2025 RFP
Aug 6, 2026
Closes
Aug 27, 2026
Project includes the following work: the project consists of upgrades to existing control system hardware at nine (9) sites. At three (3) sites, the contractor shall furnish and install new control panels. Existing input/output ((I/O) wiring shall be re‑routed and terminated at the new control panels. Existing telemetry equipment, including antennas, cabling, and masts, shall be removed.
