Grand River Mosquito Control District
Special DistrictCO
Posted
Nov 14, 2026
Dec 10, 2026
expansion construction project RFP
Construction services from qualified General Contractors for an expansion project.
Description: Completion of two (2) 6" nominal diameter groundwater test wells drilled and cased to 450 feet below ground surface and the completion of up to three (3) new 16" nominal diameter Public Water Supply (PWS) wells drilled and cased to 450 feet below ground surface.
City · MT, US
Adjacent opportunities open for bidding right now.
Grand River Mosquito Control District
Special DistrictCO
Posted
Nov 14, 2026
Dec 10, 2026
Construction services from qualified General Contractors for an expansion project.
Mendocino City Community Services District
Special DistrictCA
Posted
Nov 6, 2026
Nov 23, 2026
Construction to expand the recycled water distribution system, replace a segment of sanitary sewer main, and rehabilitate an existing sewer lift station.
North Dakota Mill and Elevator Association
State AgencyND
Posted
Nov 6, 2026
Dec 3, 2026
The installation of a 2750 kVA, 5 kV primary to 480V secondary pad mounted liquid filled transformer with FR3 fluid that has been procured by North Dakota Mill. The electrical contractor shall provide the concrete pad for the transformer. The 2750 kVA transformer will be connected to existing 5kV switchgear via a new 5 kV armored cable and new cable tray. The 480V secondary will be connected to new 480V, 4000A, 3 phase, 3 wire switchboard with distribution sections to feed (2) new 200 hp VFDs for the elevators and 800A motor control center, and various drag and conveyor motors. The new 4000A switchboard and VFDs will be located in the new MCC Room in the Terminal Elevator. The electrical controls will update existing Allen Bradley PLC for VFD controls, slide gate control, and airlocks for the Terminal Elevators and drag conveyor with the electrical contractor providing (2) empty 2" conduits for control wiring by others. The electrical controls shall also in corporate the monitoring of the BS&B controls into the existing PLC.
School DistrictNY
Posted
-
Dec 15, 2026
Capital outlay project includes ceiling replacement.
Decision makers connected to this RFP from City of Belgrade.
Solicitation files and supporting documents for this bid.