Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Bear River Water Conservancy District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
General Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Bear River Water Conservancy District
Bear River Water Conservancy District is soliciting bids to equip the South Willard Well #2, including supply and installation of the pump, motor, controls, electrical, and associated discharge piping and site improvements. Bidding documents and Q&A are administered through QuestCDN (Project No. 10030657) under J‑U‑B Engineers’ plan room. Bids are due February 12, 2026.
Posted Date
-
Due Date
Feb 12, 2026
Release: -
Bear River Water Conservancy District
Close: Feb 12, 2026
Bear River Water Conservancy District is soliciting bids to equip the South Willard Well #2, including supply and installation of the pump, motor, controls, electrical, and associated discharge piping and site improvements. Bidding documents and Q&A are administered through QuestCDN (Project No. 10030657) under J‑U‑B Engineers’ plan room. Bids are due February 12, 2026.
AvailableBear River Water Conservancy District
Work consists of on-call installation of water service meters.
Posted Date
Aug 7, 2025
Due Date
Aug 27, 2025
Release: Aug 7, 2025
Bear River Water Conservancy District
Close: Aug 27, 2025
Work consists of on-call installation of water service meters.
Bear River Water Conservancy District
Project includes the following Work: Construction of 2,850 LF of 12" C900 DR14 waterline pipe, fittings, valves, 2,830 LF of 4" PVC Power Conduit, electrical junction boxes, connection to existing waterlines, connection to existing electrical conduit and associated appurtenances.
Posted Date
May 15, 2024
Due Date
Jun 4, 2024
Release: May 15, 2024
Bear River Water Conservancy District
Close: Jun 4, 2024
Project includes the following Work: Construction of 2,850 LF of 12" C900 DR14 waterline pipe, fittings, valves, 2,830 LF of 4" PVC Power Conduit, electrical junction boxes, connection to existing waterlines, connection to existing electrical conduit and associated appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.