Water Contract no. 1463 - Urgent Need Water Infrastructure Rehabilitation and Improvements Phase III-FY27 RFP
Posted
Aug 18, 2026
Oct 7, 2026
Project consists of urgent need water main repairs and replacement as necessary, including, but not limited to, replacement/installation of various size new ductile iron pipe, valves, fittings, and appurtenances, renew and replacement of existing water services, large and small (residential) meter settings and meter vaults, replacement/installation of fire hydrants, sidewalk restoration, curb and gutter, roadway paving, sedimentation and erosion control measures and maintenance of traffic, as required.
