Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Auglaize County
Demolition and removal of entire buildings and all miscellaneous contents within the structure.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Auglaize County
Close: Feb 5, 2026
Demolition and removal of entire buildings and all miscellaneous contents within the structure.
Auglaize County Board of Developmental Disabilities
Scope includes concrete foundations and floor slab, masonry exterior walls with exterior rigid insulation clad with fiber cement panels to match existing. Low slope membrane roofing and associated trim, gutters and downspouts. Scope includes aluminum windows and storefront. Interior partitions to be metal stud and drywall with batt insulation at exterior walls. Scope includes interior wood doors and door hardware. Finishes include ACT lay-in ceiling, carpet tile, resilient base, paint, window shades, solid-surface window sills, and signage.
Posted Date
Aug 21, 2025
Due Date
Sep 23, 2025
Release: Aug 21, 2025
Auglaize County Board of Developmental Disabilities
Close: Sep 23, 2025
Scope includes concrete foundations and floor slab, masonry exterior walls with exterior rigid insulation clad with fiber cement panels to match existing. Low slope membrane roofing and associated trim, gutters and downspouts. Scope includes aluminum windows and storefront. Interior partitions to be metal stud and drywall with batt insulation at exterior walls. Scope includes interior wood doors and door hardware. Finishes include ACT lay-in ceiling, carpet tile, resilient base, paint, window shades, solid-surface window sills, and signage.
Auglaize County
200 water-based type 1 centerline (15 mil thickness); 20 water-based type 1 edge line (15 mil thickness); T - marking and centerline spotting.
Posted Date
Apr 11, 2025
Due Date
May 8, 2025
Release: Apr 11, 2025
Auglaize County
Close: May 8, 2025
200 water-based type 1 centerline (15 mil thickness); 20 water-based type 1 edge line (15 mil thickness); T - marking and centerline spotting.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Auglaize County
The 2026-2040 Auglaize County Solid Waste Management Plan focuses on demonstrating compliance with the 2020 State Plan, ensuring adequate landfill and processing capacity, and outlining programming and financial strategies for the planning period. Key priorities include maintaining a diversion rate above the 25% state goal, supporting recycling through community drop-offs and a material recovery facility, and implementing education and outreach campaigns. The plan also reserves the option to switch from a generation fee to a designation fee and outlines options for an updated facility.
The 2026-2040 Auglaize County Solid Waste Management Plan update focuses on compliance with the 2020 State Plan, ensuring adequate landfill and processing capacity, and outlining programming for the planning period. Key areas include maintaining a diversion rate above the state goal, supporting recycling through community drop-offs and a material recovery facility, and implementing education campaigns. The plan also addresses financial strategies, including the potential switch to a designation fee in 2026 and options for facility updates.
The 2050 Long Range Transportation Plan for the West Central Ohio Rural Planning Organization (WORPO) focuses on improving safety for all users by implementing safety countermeasures and improving intersection controls. It also focuses on maintaining the existing transportation network in a state of good repair by reinvesting in existing infrastructure and implementing pavement and sidewalk management programs. The plan aims to expand access to the transportation network for all users and strengthen economic competitiveness through improvements to the transportation network. It also aims to enhance the transportation system to be environmentally sustainable and resilient to natural disasters and increase collaboration between partners throughout the region.
The strategic plan focuses on solid waste management within Auglaize County, covering the period from 2020 to 2034. It addresses waste generation, recycling, and disposal strategies, including managing facilities and programs. A key aspect involves adapting to changes caused by the establishment of Pratt Industries in Wapakoneta, which is expected to significantly increase both waste and recycling volumes. The plan also details financial strategies, district rules, and methods for measuring progress toward waste reduction goals, while ensuring compliance with Ohio EPA regulations.
The Board of Auglaize County Commissioners will conduct hearings to consider adopting a per parcel charge for the Auglaize County Solid Waste Management District services. The hearings will explain the necessity of a twenty dollar charge on residential, agricultural, commercial, industrial, and exempt buildings. The BOCC is considering the improved parcel fee due to the Ohio Supreme Court's late 2007 ruling against the county regarding responsibility to pay for monitoring at the St. Marys Landfill.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Auglaize County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database